Detectable warning

A detectable warning is a tactile boundary cue whose installed pattern must still work across tile cuts and expansion joints. Under 2023 PROWAG, a field with 2-inch dome centers permits at most 4 inches between centers at a qualifying cut. Check placement from both ends of a curved grade break and size the field separately from any permitted concrete border.

Truncated-dome panel at a curb ramp warning of the edge between walk and vehicular way

Used across 3 Anvilfield field guides, most in Paving.
Updated

Dimensions for a warning-panel submittal

The Access Board’s 2023 PROWAG R305.1.1 through R305.1.4 supplies the following product and layout dimensions. Check the assembled field as well as the tile data, especially where a curved edge forces cuts.

FeaturePROWAG dimension
Dome base diameter0.9 to 1.4 in
Dome top diameter50% to 65% of base diameter
Dome height0.2 in
Ordinary dome centers1.6 to 2.4 in apart
Clear space between adjacent dome basesAt least 0.65 in
Depth along pedestrian travelAt least 24 in

Cut panels without losing the dome pattern

The Access Board’s 2023 PROWAG section R305.1.2 permits spacing across cut edges up to twice the normal center-to-center dome spacing. That is a specific cut-edge allowance, not permission to increase spacing throughout the installation. A panel with normal 2-inch spacing can therefore have up to 4 inches between the adjacent dome centers at a qualifying cut.

PROWAG R305.1.2 also exempts dome spacing at an expansion-joint gap when the warning surface aligns with both edges of that joint. Show the joint alignment on the installation detail; a random gap between panels is a different condition.

Locate the warning from the actual grade break

When both ends of a perpendicular ramp’s bottom grade break lie behind the back of curb, PROWAG R305.2.1 changes warning placement if either end is more than 60 inches back. In that configuration, the warning belongs on the clear area with both front corners at the back of curb, rather than simply following the bottom of the ramp run.

Measure the distance at each end of a curved grade break. If both ends are behind the curb and both distances are 60 inches or less, R305.2.1(B) keeps the warning at the bottom grade break on the ramp run. In the no-curb cases covered by R305.2.1(A) and (C), the permitted pavement-edge setback is at most 6 inches. That setback is not a placement rule for every no-curb configuration. Retain the selected layout with the curb-ramp detail.

Treat borders and color as separate decisions

PROWAG R305.2 permits a concrete border of at most 2 inches where that border is needed for proper installation. It does not add that border between the warning and pavement edge when an allowed setback already occupies that side. Set the tactile field first and detail the installation border around the permitted location.

PROWAG R305.1.3 requires visual contrast, either light against dark or dark against light; it does not prescribe yellow. Compare the selected panel with the adjacent finished surface. The Access Board’s adoption page distinguishes its 2023 guidelines from agency adoption, including DOT’s December 2024 adoption for new and altered transit stops in public rights-of-way. Record the applicable agency or local requirement in the submittal.

Distinctions

Flare
The side transition of a curb ramp is excluded from the warning width specified for the ramp run. Panel takeoff should follow the intended walking connection.
Directional tactile surface
A surface intended to guide travel conveys different information from a warning of a boundary. Substituting a texture changes the message.

Frequently asked questions

Does cutting through a dome automatically reject a tile?

No. PROWAG R305.1.1 permits partial domes along cut edges. The completed installation must still satisfy the applicable spacing, placement and other surface requirements.

Sources checked

Also defined as

  • The field of truncated domes warning a person with low vision of the street edge

Where this shows up

Next step: See public paving bids

Back to the full field glossary