Field glossary · component
Flare
On a curb-ramp inspection, a flare is the side surface crossed by pedestrians beside the ramp run. Measure its rise and horizontal run parallel to the curb: PROWAG R304.2.6 sets a 1:10 maximum in that direction. A 6-inch rise needs at least 60 inches of run. Landing dimensions and the separate ADA alteration exception must be checked under their own provisions.
The sloped side of a perpendicular ramp, walkable at 10 percent (1:10) maximum
Put the level parallel to the curb line
The Access Board’s PROWAG R304.2.6 limits a required curb-ramp side flare to 1:10 and specifies measurement parallel to the adjacent curb line. Measuring along an arbitrary diagonal changes the run used in the calculation and can conceal excessive slope.
A 6-inch rise over 60 inches of horizontal run is 10%; over 48 inches it is 12.5%. Put the level on the required line and identify both endpoints on the sketch. A reading along the steepest-looking diagonal is not the parallel-to-curb measurement named in PROWAG, even when the instrument itself is accurate.
An alteration exception has a different side-slope limit
The Access Board’s guide to the 2010 ADA Standards explains the alteration exception in section 406.4: where a top landing cannot be provided, the side flares are limited to 1:12. That exception belongs to the ADA landing provision. It does not amend PROWAG’s separate landing requirements.
The ADA guide identifies 36 inches as the minimum top-landing length under the ADA Standards. PROWAG R304.2.5 instead specifies a minimum 48-by-48-inch landing where a direction change is necessary to access a perpendicular curb ramp. State the governing framework and configuration before comparing a measured landing with a remembered number.
Decide whether pedestrians cross the side
Apply PROWAG R304.2.6 to each side that intersects a pedestrian circulation path. Trace approaches from both sidewalk directions and from adjoining paved areas; a single arrow down the ramp does not show every crossing movement. A side crossed by pedestrians needs the flare treatment specified there.
A returned curb alongside planting can serve a different arrangement from a traversable flare. Preserve that side treatment in the curb-ramp detail and account for later landscaping or pavement changes that could make the side part of a walking route. Outside the stated alteration exception, the required landing must provide its turning space independently of the flare.
Distinctions
- Refrigerant flare
- A tube flare seals against a mating fitting. Diameter, flare preparation and tightening requirements come from that refrigeration connection, not a sidewalk slope ratio.
- Root flare
- The widening where a tree trunk meets major roots identifies planting depth. It is unrelated to either the ramp transition or tube fitting.
Frequently asked questions
Why can two slope readings on the same flare disagree?
The instruments may span different directions or surface irregularities. Record the direction, endpoints and measured rise and run; compare the measurement required by the governing detail before averaging readings.
Sources checked
Also defined as
- HVAC: The 45-degree mechanical refrigerant connection torqued to spec; the primary leak source