Cross-slope

Across a pavement or walkway, cross-slope is the elevation change perpendicular to travel divided by horizontal width, expressed as a percentage. A 0.06 ft fall across 4 ft is 1.5%. Record direction as well as magnitude: equal readings tipped opposite ways lead to different outlets. For accessible work, distinguish the written 1:48 limit from a 2% target and from a reading in degrees.

The tilt across the width of the surface that sheds water, usually given as a percent

Used across 2 Anvilfield field guides, most in Paving.
Updated

Percent, degrees and inches per foot

Section 403.3 of the 2010 ADA Standards limits accessible walking-surface cross-slope to 1:48, which calculates to approximately 2.083%. That ratio is exactly 1/4 in of fall per horizontal foot. A 2.00% design slope is slightly flatter, at 0.24 in per foot. Preserve the specified ratio or percentage instead of rounding between the two during layout.

Degrees use a different calculation: percent slope = 100 × tan(angle). Setting a digital level to 2 degrees produces approximately 3.49% slope. Conversely, 2% is approximately 1.146 degrees. Select the percent display before comparing a reading with the cross-slope setpoint used for grade control.

Unit on the plan or instrumentEquivalent fall
1:480.25 in per horizontal ft; about 2.083%
2.00%0.24 in per horizontal ft
2 degreesAbout 3.49%; 0.419 in per horizontal ft

A reading across the lane is an average

Measure between identified offsets from the same reference line, with elevations tied to the same benchmark. For a surface that changes direction, check each segment between grade breaks. A straightedge bridging an irregular surface describes the slope between its contact points; it does not show every local slope underneath.

Take a 4 ft walk with elevations of 100.00, 99.95 and 99.94 ft at offsets of 0, 2 and 4 ft. Its overall fall is 0.06 ft, or 1.5%. The first half falls 0.05 ft in 2 ft, or 2.5%, while the second half is 0.5%. The overall reading hides a segment steeper than 1:48. The same endpoint problem occurs when checking a milled profile before an overlay.

Why two passing directions can fail on the diagonal

Section 502.4 of the 2010 ADA Standards applies the 1:48 slope limit to accessible parking spaces and access aisles, with the advisory identifying the need for nearly level surfaces in all directions. On a planar pad, the steepest slope is the square root of the sum of the squared slopes along two perpendicular axes. With 2% along each axis, the diagonal slope calculates to approximately 2.83%.

The National Park Service's Denver Service Center requires a maximum 1.5% design cross-slope on its projects to leave construction margin under the Architectural Barriers Act Accessibility Standards. That agency design requirement is separate from the 2010 ADA Standards' 1:48 criterion. A parking-pad layout needs the steepest-direction calculation alongside the stall and aisle requirements in the accessible parking guide.

For two equal perpendicular grades, divide the intended maximum plane slope by √2. Keeping a planar pad's steepest slope at 2.00% requires each equal component to be no steeper than about 1.414%. Setting both components to 1.5% produces about 2.12% diagonally, so two individually modest design grades still need a combined check.

Distinctions

Crown
A crowned section has a high line separating slopes that drain in opposite directions. An edge-to-edge elevation difference can be zero even though both sides have substantial cross-slope.
Running slope
When a walkway turns 90 degrees, the former cross-slope becomes running slope for the new route alignment. Attach the travel direction and route segment to every reading so the report identifies which limit applies at that location.

Frequently asked questions

Is a 2% cross-slope the same as 2 degrees?

No. Two degrees is about 3.49%. Record the instrument's unit setting with the reading; the numeric display alone is insufficient.

How should I record the direction of fall?

State the viewing direction, station and offsets, then identify the high and low sides. A signed percentage needs an explicit convention to remain useful to the next crew.

Sources checked

Also defined as

  • The fall across the lane that sheds water, held by the slope sensor

Where this shows up

Related guides

Next step: Map parking lot accounts

Back to the full field glossary