Field glossary · measurement
IRI
IRI, the International Roughness Index, reports the accumulated suspension movement of a standard mathematical vehicle per length of measured pavement profile. Lower values describe a smoother profile. A result of 100 inches per mile equals about 1.578 meters per kilometer. Keep the wheel track and reporting length with the number; IRI is neither roadway grade nor the survey truck’s measured body motion.
International roughness index, a measure of pavement smoothness used for ride acceptance and pay
The 80 km/h speed belongs to the model
FHWA’s Achieving a High Level of Smoothness describes IRI as a quarter-car simulation run at 80 km/h over the measured profile. That simulation speed is distinct from the collection vehicle’s operating speed, which follows the profiler’s requirements.
The model sums absolute suspension motion and divides by distance. Reversing an upward motion does not cancel a previous downward motion. This explains why a profile that finishes at its starting elevation can still have substantial roughness, and why endpoint elevation difference cannot be used to calculate IRI.
Keep both wheel-track results with the mean
ASTM E1926-08(2021) identifies mean roughness index, MRI, as the better road-surface measure when both traveled wheel tracks are profiled simultaneously. MRI uses the same scale as IRI.
If one wheel track has IRI 80 inches per mile and the other 120 inches per mile, their mean is 100 inches per mile. Using 25.4 millimeters per inch and 1.609344 kilometers per mile, that mean is approximately 1.578 meters per kilometer. Retaining the two original values reveals an imbalance that disappears from the average. Identify direction, lane and track in the delivered data.
Segment length changes what the number describes
FHWA-HRT-05-068 reports that IRI is influenced mainly by wavelengths from 1.2 to 30.5 meters, with maximum sensitivity near 2.4 and 15.4 meters. Preserve the profile file and processing settings so the reported section can be reproduced and the influential surface shapes located.
A short rough transition can contribute little to a long section’s average while remaining important to the driver. Report the start and end stations with each statistic and retain the local profile through the transition. The paving inspection guide addresses acceptance; the applicable contract determines whether its decision uses individual wheel tracks, MRI, localized roughness or several measures together.
What counts as a good IRI result?
For federal pavement performance reporting, 23 CFR 490.313(b)(1) rates IRI below 95 in/mi as Good, 95 through 170 in/mi as Fair, and above 170 in/mi as Poor. These are condition-reporting bands, not a new-paving acceptance schedule. The contract names the construction acceptance limits and any localized-bump criteria.
The 100 in/mi mean in the wheel-track example falls in the federal Fair IRI band. That classification alone does not determine the pavement’s overall condition: section 490.313 combines IRI with the other condition metrics applicable to the pavement type. Preserve the individual track results even when the reporting system needs a single summary.
Distinctions
- Cross slope
- Cross slope describes elevation change across the pavement. IRI processes the longitudinal profile along a traveled track.
- Straightedge deviation
- A straightedge checks departure from a local reference line. Its maximum gap and IRI do not have a one-to-one conversion because they respond differently to profile shape and length.
Frequently asked questions
Can I average IRI values from unequal-length sections?
A simple unweighted average gives short and long sections equal influence. For a summary of reported sections, preserve their lengths and use the required weighting procedure. Reprocessing a combined profile may also involve different segment initialization.
Sources checked
Also defined as
- International Roughness Index, the profiler-based smoothness number used for ride acceptance
- International Roughness Index, the smoothness measure behind most ride pay schedules