Field glossary · measurement
PWL
PWL, percent within limits, uses a lot’s sample mean, sample standard deviation and sample-size table to estimate the portion meeting specification limits. It is not the percentage of tests that passed. In FHWA’s four-test table, a one-sided quality index of 1.35 corresponds to 95 PWL. The contract’s pay-factor equation is a further calculation, not the definition of PWL.
Percent within limits, the share of a lot estimated to fall inside the specification limits, used for statistical acceptance and pay
Measure the distance to each limit in standard deviations
FHWA-RD-02-095 defines the lower quality index as QL = (sample mean - lower limit) / sample standard deviation and the upper index as QU = (upper limit - sample mean) / sample standard deviation. The indices locate the specification boundaries relative to the estimated distribution.
For densities reported as percent of Gmm, a mean of 94.0, limits of 92.0 and 96.0, and sample standard deviation of 0.5 percentage point give QL = QU = 4.0. Increasing the standard deviation to 1.5 with the same mean and limits gives QL = QU = 1.333. The unchanged mean hides a substantial increase in spread.
Use the table for the actual sample size
FHWA-RD-02-095 Table 5 associates a quality index of 1.35 with 95 PWL for a four-test sample. That relationship comes from the sample-size-specific PWL table, not an unrestricted substitution of Q into a standard normal-distribution calculator.
The same FHWA report shows that, for five tests and Q = 1.18, its example table produces PWL 89, 88 or 88.5 depending on rounding upward, downward or interpolation. Record the contract’s rounding rule before calculating payment; the choice can change the reported acceptance measure without changing a test result.
Combine two tails before applying the pay rule
FHWA-RD-02-095 combines two-sided PWL as the one-sided percentage below the upper limit plus the one-sided percentage above the lower limit, minus 100. Estimates of 98% and 97% therefore produce 95 PWL. Averaging them to 97.5% understates the combined out-of-limit material.
FHWA Technical Advisory T5080.12 treats conformity analysis as an estimate whose uncertainty depends on sample size. Retain the lot limits and random sampling record, then apply the pay schedule described in the paving acceptance guide. A reported 95 PWL does not by itself authorize payment at 95% of the bid rate.
Distinctions
- Percent passing tests
- A count of passing observations describes the sample directly. PWL estimates conformity of the underlying lot using a distribution model.
- Confidence level
- Confidence describes uncertainty in an inference. A reported 95 PWL is not a declaration of 95% statistical confidence.
Frequently asked questions
What if the lot combines two visibly different production populations?
The FHWA method assumes an approximately normal population, not a strongly skewed or bimodal mixture. Review the defined lot, process changes and required analysis before interpreting one pooled mean and standard deviation.