Field glossary · measurement
Gmm (Rice value)
Rice testing determines Gmm by removing air from loose asphalt mixture under controlled vacuum and measuring the volume its solids and binder displace. A theoretical maximum specific gravity of 2.500 means the air-free mixture has 2.500 times the density of the reference water. A useful Rice report identifies the sample, conditioning, container standardization, residual pressure and temperature. Retained air biases Gmm downward; water entering uncoated aggregate pores biases it upward unless corrected.
Theoretical maximum specific gravity of the loose mix, the zero-void density and the 100 percent reference (AASHTO T209 / ASTM D2041)
Which Rice methods and vacuum settings apply?
As of November 5, 2026, AASHTO's 46th edition catalog lists T 209-25, and ASTM identifies D2041/D2041M-26e1 as its active Rice method. ASTM's public scope places the determination at 25°C. Put the actual method and edition on the report so its preparation and measurement requirements remain identifiable.
WAQTC specifies 4.0 ±0.6 kPa residual pressure for 15 ±1 minutes in its 2026 AASHTO T 209-25 procedure for removing entrapped air. This is absolute pressure in the vessel; a 4.0 kPa reduction from atmospheric pressure is a different condition. The procedure pairs that vacuum with continuous mechanical agitation or vigorous manual shaking at two-minute intervals. Vacuum duration without the required pressure and agitation does not establish the same test condition.
Prepare enough loose mix without breaking the aggregate
WAQTC's 2026 T 209 procedure requires at least 1500 g of test material for mixtures with nominal maximum aggregate size of 12.5 mm or smaller; mixtures from 19 to 25 mm require at least 2500 g. An oversized sample can be tested in portions, with results combined by the procedure's mass-weighted calculation. Preserve the required total sample mass when dividing it between containers.
The procedure calls for separating the loose mixture without fracturing mineral particles, reducing fine-aggregate clumps to no larger than 6.3 mm. A compacted plug is not the Rice specimen. Preserve the production sample's identity and conditioning history so the reference used in the compaction-window guide belongs to the material actually placed.
Calculate Gmm from pycnometer masses
For the ordinary pycnometer calculation in WAQTC's procedure, Gmm = A / (A + D - E). A is dry mixture mass, D includes the standardized water-filled pycnometer and its cover, and E includes that same container and cover with the de-aired mixture and water. The water-filled reference and final determination must use the specified temperature basis.
A 2000.0 g sample, a water-filled reference of 7500.0 g and a final mass of 8700.0 g produce Gmm = 2000.0 / 800.0 = 2.500. Preserve those masses as well as the reported result. Replacing a container or its cover requires the corresponding standardized reference; retaining an old D value silently changes the displaced-volume calculation.
Why retained air makes compaction look better
The pycnometer equation shows the direction of an air-removal error: air left in the vessel occupies space that should contain water, lowering E and increasing the apparent displaced volume. In the preceding calculation, a final mass 10.0 g too low changes the denominator to 810.0 g and the calculated Gmm to 2.469.
Using a compacted-specimen Gmb of 2.350, the correct 2.500 reference gives 94.0% compaction. Substituting the biased 2.469 value gives about 95.2%. The specimen has not become denser. This arithmetic connects a vessel-level error to the acceptance result discussed in asphalt density testing.
Correct the opposite error from water absorption
WAQTC's 2026 T 209 procedure adds an SSD determination when water enters uncoated porous aggregate. For the pycnometer, corrected Gmm = A / (A_SSD + D - E), where A_SSD is the mixture's saturated-surface-dry mass after vacuuming. The numerator retains dry mass A. Ignoring absorbed water makes the denominator too small and Gmm too high.
A run with A = 2000.0 g, D = 7500.0 g, E = 8710.0 g and A_SSD = 2010.0 g gives an uncorrected Gmm of 2.532. The SSD correction restores the denominator to 800.0 g and Gmm to 2.500. This error moves the result in the opposite direction from retained air; extending the vacuum time does not supply the missing absorption measurement.
Distinctions
- Portions of one sample versus independent test results
- WAQTC's 2026 T 209 procedure requires rerunning a test when increments used to accommodate container capacity differ in specific gravity by more than 0.013. That criterion applies to those increments; it is not a blanket tolerance for every comparison between laboratories or production samples.
Frequently asked questions
Should a Rice result be reported as 2.5 or 2.500?
WAQTC's 2026 T 209 procedure reports Gmm to three decimal places, so write 2.500. Keep the original mass readings so another technician can reproduce the calculation and its rounding.