ANVILFIELD Try FieldOS

Field glossary · measurement

Air voids

For a compacted asphalt core, air voids quantify the space left between aggregate and binder. Report the percentage alongside the bulk-volume method and the matching loose-mix reference: a specimen absorbing more than 2.0% water by volume is outside ASTM D2726/D2726M-26’s measurement scope. Changing the reference can change calculated voids even when the core has not changed.

The percentage of air in the compacted mat; high voids let in air and water and shorten pavement life

Used across 2 Anvilfield field guides, most in Paving.
Updated

Check the specimen before trusting the percentage

ASTM D2726/D2726M-26 excludes compacted specimens with open or interconnected voids and specimens absorbing more than 2.0% water by volume from its bulk-specific-gravity procedure. That exclusion matters when a porous core is treated as an ordinary dense specimen: water movement during weighing can undermine the measured bulk volume.

Record the absorption result and selected method with the core identification. An alternative volume method must be suitable for the specimen and accepted under the testing specification; repeating an unsuitable saturated-surface-dry measurement does not resolve the method limit.

Calculate voids with the matching Rice value

Calculate air voids as Va = 100 x (1 - Gmb / Gmm), where Gmb is the compacted specimen’s bulk specific gravity and Gmm is the corresponding loose mixture’s maximum specific gravity. The density testing guide explains the underlying measurements. The comparison below holds the core constant and changes only its reference.

For Gmb = 2.350, using Gmm = 2.500 gives 6.00% air voids; using 2.450 gives 4.08%. That 1.92-percentage-point difference is a reference change, not additional roller compaction. Preserve the mix designation, production lot and loose-sample identification with the calculation.

Same coreGmm usedAir voids
Gmb 2.3502.5006.00%
Gmb 2.3502.4504.08%

Volume fraction is not a water-flow test

ASTM D3203-22 identifies air-void content as a mix-design criterion and a measure for evaluating compaction. That volume fraction does not measure how readily water travels through a core. Two specimens with equal void volume can have different pore connections; a permeability investigation needs evidence of flow as well as the void result.

ASTM D2726/D2726M-26 treats specific gravity as dimensionless and obtains density by multiplying it by water density at the same temperature. Thus a value such as 2.350 is not itself a density in pounds per cubic foot. Keep the units of the source measurements visible when reconciling laboratory reports.

Distinctions

Concrete air content
Entrained air in concrete is a deliberately formed bubble system. Its testing and durability criteria cannot be transferred to the asphalt void calculation.
Voids in mineral aggregate
VMA accounts for effective binder and air together. Subtracting the binder-filled space leaves the air-only volume reported as Va.

Frequently asked questions

Can an apparently improved void result prove better rolling?

Only after comparable sampling and measurement are established. A change in bulk-volume method, mix reference or specimen condition can change the reported number independently of roller performance.

Sources checked

Also defined as

  • The percentage of the compacted mat that is air, the inverse of percent of Gmm

Where this shows up

Next step: Find parking lot accounts

Back to the full field glossary