Field glossary · measurement
Density
Density is material mass divided by occupied volume, reported in units such as lb/ft3 or kg/m3. A dry sample weighing 1.50 lb in 0.10 ft3 has a density of 15.0 lb/ft3. A pavement result reported as 94% is a comparison with a reference, rather than an absolute density. Identify the material condition, included voids, and reference value before using either number for acceptance or quantities.
Mass per unit volume of applied SFRM, verified to ASTM E605 against the listed minimum
Separate density from specific gravity
FHWA's Background of Superpave Asphalt Mixture Design and Analysis defines specific gravity as a ratio to an equal volume of water at the same temperature. It has no units. Using that publication's water reference of 1.000 g/cm3, a specific gravity of 2.400 corresponds to 2.400 g/cm3, or 2400 kg/m3. Equal numerical values in g/cm3 do not make density and specific gravity interchangeable quantities.
The occupied volume also needs a name: a specimen's exterior volume includes internal voids, while a particle-density determination uses a different volume basis. Record that basis along with moisture condition. A wet result cannot be compared directly with a dry minimum merely because both reports say lb/ft3.
A minimum average does not erase an individual minimum
ASTM E605/E605M-19(2023) provides SFRM thickness and density test methods without setting acceptance minima. The following dry-density limits belong specifically to CAFCO 300 AC.
Isolatek's June 2025 CAFCO 300 AC guide states a minimum average dry density of 15 lb/ft3 and a minimum individual density of 14 lb/ft3. Isolatek requires CAFCO 300 AC on cellular deck to reach a minimum average of 17.5 lb/ft3 and an individual minimum of 16.0 lb/ft3. These paired limits explain why an acceptable average does not clear every low specimen.
Three dry-density results of 13.8, 15.6, and 16.2 lb/ft3 average 15.2 lb/ft3. Against the stated ordinary CAFCO 300 AC limits, the average clears 15, but the 13.8 result falls below 14. The report must retain both comparisons and the specimen locations. Combining them into one green average hides the deficient location.
When extra coverage signals low density
Isolatek warns that exceeding 46 board feet of coverage per bag of CAFCO 300 AC produces densities below 15 lb/ft3. That is a product-specific yield warning: apparent coverage savings can mean too little dry material in the installed volume. Compare bag consumption, measured thickness, and the application checks when a density result drops.
Isolatek's nozzle-cup chart estimates dry density and yield from wet cup weights at the stated water rate per bag. Keep that water rate with the cup weight. A nozzle check predicts an application result; it is a different record from the recovered specimen's dry-density test.
Why a specific gravity of 2.400 is not a compaction percentage
FHWA's LTPP Inventory Data Collection Guide distinguishes a compacted mixture's bulk specific gravity, Gmb, from the mixture's zero-air-void maximum specific gravity, Gmm. With Gmb of 2.400, a mixture whose Gmm is 2.500 calculates to 96.0%; a different mixture whose Gmm is 2.550 calculates to 94.1%.
Those equal bulk results differ by 1.9 percentage points of their respective maximums. Put the mixture identifier and reference result beside the percentage in the asphalt compaction record. A reference copied from another mixture changes the reported percentage without changing the core. The table retains the inputs behind both calculations.
| Mixture | Measured Gmb | Reference Gmm | 100 × Gmb / Gmm |
|---|---|---|---|
| A | 2.400 | 2.500 | 96.0% |
| B | 2.400 | 2.550 | 94.1% |
Distinctions
- Bond strength
- Bond testing measures force per area needed to separate material. Density measures mass per volume; the two results cannot be substituted for each other.
- Density versus yield
- Density divides mass by volume. Yield divides a known batch mass by its measured density to obtain volume. A density test can support a quantity calculation without itself being a volume measurement.
Frequently asked questions
What does pcf mean on a density report?
Pcf means pounds per cubic foot, written lb/ft3. Isolatek's ordinary CAFCO 300 AC limits are 15 pcf for the average and 14 pcf for an individual dry-density result; neither number is a percentage.
Can a density result be compared across different materials?
Equal units permit a numerical comparison, but acceptance still needs the material's own reference. A low-density insulating coating and a compacted pavement are designed for different functions; neither inherits the other's target.
Sources checked
- FHWA: Background of Superpave Asphalt Mixture Design and Analysis, density and specific gravity
- FHWA: LTPP Inventory Data Collection Guide, March 2006, asphalt bulk and maximum specific gravities
- ASTM E605/E605M-19(2023): scope and purpose of SFRM thickness and density testing
- Isolatek: CAFCO 300 AC short-form application guide, June 2025
Also defined as
- Paving: How tightly the mat is compacted, the inverse of air voids, and the strongest predictor of how long the pavement lasts