ANVILFIELD Try FieldOS

Field glossary · property

Tender zone

A tender zone is identified by renewed sideways movement after an asphalt mat has already supported rolling; the 2025 Asphalt Paving Handbook gives a typical midrange band of about 240 to 190°F. A 12 ft pull spreading to 12 ft 3 in has moved 3 in, even if its density result passes. Record displacement, measurement depth and recovery temperature together to separate instability from inadequate compaction.

A temperature band where the mat is unstable under the roller and shoves or checks instead of compacting

Used across 2 Anvilfield field guides, most in Paving.
Updated

Why a mat can become unstable as it cools

The 2025 Asphalt Paving Handbook presents differential cooling through the lift as one explanation for midrange tenderness. The surface and bottom gain stiffness before the hotter middle can resist the roller's lateral force. Treat this as a mechanism to test against the observed sequence, rather than diagnosing the entire lift from one surface reading.

NCAT Report 00-02, April 2000, documented tenderness continuing to surface temperatures as low as 150°F on some projects. Those historical surface observations should not be substituted for an internal cessation-temperature criterion. Identify both measurement locations before deciding how much workable interval remains below an observed tender band.

Measure sideways movement as well as density

NCAT Report 00-02 reported typical lateral movement of approximately 2 to 4 in while tender mixtures were rolled. That movement is a useful field observation in addition to checking cracks or a wave ahead of the drum. Establish an edge reference before the affected roller pass, then retain the edge displacement, temperature and pass history together.

A mat placed 12 ft wide and measured at 12 ft 3 in after rolling has spread 3 in. The density result alone does not describe that change in geometry. Compare the edge and surface profile as well as the gauge readings when documenting the compaction operation. Record which edge moved so the observation is not confused with a change in paver width.

NCAT also found that achieving the required density in a tender mixture did not erase roughness introduced by lateral movement. Retain the smoothness finding separately. A satisfactory density measurement cannot close a surface-profile defect.

Keep tire pressure in the tender-zone trial record

The 2025 Asphalt Paving Handbook, Section 8.3.2, gives typical pneumatic-roller inflation pressures of 70 to 75 psi cold and about 90 psi hot for most mixtures, with lower pressures used for tender mixtures. A pressure recorded hot is a different starting condition from the same number recorded cold. Keep tire condition and ballast with the roller settings when comparing two trial patterns.

The handbook also recommends warming clean pneumatic tires by rolling on previously placed mat for at least 10 minutes. In a tender-zone trial, track pickup and edge movement as the tires warm. A comparison between cold tires at the start and hot tires later changes roller behavior as well as mat temperature, so it cannot isolate the tender band's boundaries.

NCAT Report 00-02 describes successful rubber-tire rolling within the unstable band and warns that postponing steel-wheel compaction to about 150°F or below increases aggregate-breakage risk. Use the measured recovery temperature together with the project's density-building cutoff: recovery that occurs below that cutoff leaves no demonstrated interval for more density. The compaction operation needs a roller setup that builds density earlier.

Which defects imitate a tender zone?

The 2025 Asphalt Paving Handbook identifies poor overlay bonding as a cause of apparent tenderness under rollers. Movement concentrated at an interface therefore points to a different cause from a mixture that repeatedly becomes unstable within the same temperature band. Compare the affected area's bond condition and locations with the onset and recovery temperatures.

High-temperature tenderness begins near initial placement and improves as the mat cools into a stable range. Midrange tenderness follows an earlier period when the same mixture supported rolling. Use that sequence, along with material and bond evidence, to explain the observation in the compaction-window record. A crack photographed without the preceding pass and temperature information cannot distinguish those cases.

Distinctions

Thermal segregation
Thermal segregation compares temperatures at different locations across the placed mixture. A tender zone tracks how one mixture's stability changes as it cools. A mat can exhibit both conditions.
Mix classification
NCAT's report discusses coarse-graded Superpave mixtures exhibiting tenderness. A fine-graded or coarse-graded label alone does not diagnose the temperature band or explain the cause.

Frequently asked questions

Should the steel roller wait until the mat stops moving?

First compare the recovery temperature with the established cessation temperature. Recovery below that limit does not restore the lost density-building interval. NCAT's field guidance supports pneumatic rolling through the tender band while warning about aggregate breakage from delayed low-temperature steel rolling.

Does tenderness automatically mean the mix will rut?

Midrange tenderness alone does not establish future rutting. The 2025 Asphalt Paving Handbook links high-temperature tenderness with later rut susceptibility, while NCAT Report 00-02 separates satisfactory density from roughness left by midrange lateral movement. Record which behavior occurred instead of assigning both the same performance prediction.

Sources checked

Also defined as

  • A mid-temperature band where some mixes shove or check under a steel drum

Where this shows up

Next step: Plan parking lot outreach

Back to the full field glossary