Field glossary · process
Segregation
A segregation report identifies which part of a mix has separated or cooled differently, then states the measurement and location. A 50°F asphalt temperature differential is moderate under TxDOT Tex-244-F, effective July 2023; it does not establish aggregate grading or concrete stability. Report asphalt thermal variation in °F, asphalt density-profile differences in lb/ft³, and concrete column-test results as coarse-aggregate separation. These measurements answer different acceptance questions.
Non-uniform separation of coarse and fine aggregate (physical) or cold lumps in the mat (thermal)
Thermal severity depends on the calculated differential
TxDOT's July 2023 Tex-244-F assigns differentials above 25°F through 50°F to moderate thermal segregation and those above 50°F to severe. For a paver-mounted system, the calculation is the 98.5th-percentile temperature minus the 1st-percentile temperature. The endpoints are statistical values, rather than the hottest and coldest individual pixels. These profiles show the boundary cases:
| 98.5th-percentile temperature | 1st-percentile temperature | Difference | Tex-244-F result |
|---|---|---|---|
| 300°F | 275°F | 25°F | No thermal segregation |
| 300°F | 250°F | 50°F | Moderate |
| 300°F | 249°F | 51°F | Severe |
Which readings belong in a thermal profile?
Tex-244-F specifies approximately 150 ft profiles with readings at intervals no greater than 1 ft of forward paver travel. That is a longitudinal interval. The system also excludes the outer 2 ft of each mat edge from influencing the profile result.
For Veta analysis, Tex-244-F specifies the "minimum temperature > 180°F" filter and removal of cold edges and ride brackets. Save the raw file and filtering settings with the result. Use Tex-244-F, sections 2.2, 3.9, and 4 for measurement controls alongside the handling causes in the asphalt segregation guide.
Why a density profile can pass one limit and fail
TxDOT's 2024 Item 341 allows DG-C, DG-D, and DG-F segregation profiles a highest-to-lowest spread of 6.0 lb/ft³ and an average-to-lowest drop of 3.0 lb/ft³. DG-B allows 8.0 and 5.0 lb/ft³, respectively. Section 4.9.3.3.3 makes these profiles inapplicable when a thermal imaging system is used and in its defined miscellaneous areas. This profile check has its own limits, separate from the core-density acceptance calculation.
A DG-D profile with a high of 151 lb/ft³, a low of 145 lb/ft³, and an average of 149 lb/ft³ passes the 6 lb/ft³ spread but fails on its 4 lb/ft³ average-to-low drop. Both comparisons must pass. The 2024 Item 341 requirements provide the two limits and identify Tex-207-F, Part V, as the profiling method.
Confirm composition with separate asphalt samples
NAPA's 2025 Asphalt Paving Handbook lists binder-content testing and aggregate gradation after binder removal as measurements of physical segregation. Preserve the suspect area's sample and its comparison sample separately; blending them would erase the local difference. Compare their results with the lot's distribution and the approved job mix formula, as described in the handbook's section 10.5.
At a casting or curb repair, mark the sample boundary before removal and retain its location on the sample record. The laboratory result then identifies the material removed from that pocket. Coordinate sampling with the removal work in the joints and handwork plan.
Pick the concrete test by the decision it supports
ASTM C1610/C1610M-24 determines static segregation in self-consolidating concrete from coarse aggregate collected in the top and bottom of a column specimen. Its scope excludes lightweight aggregate concrete. The C1610/C1610M-24 public scope supports mixture qualification and measured separation; plan its test time separately from the concrete placement operation.
ASTM C1712-24 uses penetration for rapid screening of normal-weight SCC before placement. It assesses the likelihood of static segregation rather than measuring separation directly. ASTM developed it with nominal maximum aggregate sizes of 9.5 to 25 mm and SSD aggregate relative densities of 2.67 to 2.79. Its scope recommends correlation testing outside those ranges and requires prior correlation for lightweight or heavyweight aggregates. The C1712-24 public scope supplies those applicability limits for the SCC testing plan.
Frequently asked questions
Does a uniform thermal profile prove the aggregate is uniform?
A thermal result records temperature variation, not particle-size distribution. When an area has a rocky texture despite a uniform temperature profile, use separate binder-content and gradation results to establish whether its composition differs from the surrounding lot.
Is the concrete visual stability index a measured segregation percentage?
ASTM C1712-24 describes the visual stability index as a qualitative, subjective assessment. Identify the output on the test record: a visual rating, a penetration depth, or a column-test segregation result. Converting a visual rating into a measured separation percentage misstates what was tested.
Sources checked
- TxDOT: Tex-244-F, effective July 2023, percentile boundaries, longitudinal sampling, edge exclusion, and Veta filters
- TxDOT: 2024 Standard Specifications, Item 341, section 4.9.3.3.3 and Table 18
- NAPA: Asphalt Paving Handbook, 2025 edition, section 10.5, confirming and quantifying segregation
- ASTM International: C1610/C1610M-24, active edition, public scope and significance
- ASTM International: C1712-24, active edition, public scope and significance
Also defined as
- Concrete: Separation of the coarse aggregate from the paste, from dropping or moving the mix too far
- Non-uniform distribution of the mix across the mat, in gradation, temperature, or both