Field glossary · measurement
Lift
Refrigeration lift needs a measurement basis: the same chiller can have 48°F of leaving-water lift and 57°F of refrigerant saturation-temperature lift. The extra 9°F comes from the two heat-exchanger approaches in the example below. Report the endpoints, units and load with each result. Water temperatures alone can remain steady while condenser fouling increases the refrigerant lift and compressor work.
The difference between condensing and evaporating temperature; the wider it is, the harder the compressor works
Refrigerant lift and water-temperature lift use different endpoints
Trane's Chilled-Water Systems clinic defines the fluid-temperature lift used in its chiller rating-adjustment calculation as leaving condenser-water temperature minus leaving evaporator-water temperature. That is a water-side calculation. Refrigerant-temperature lift instead subtracts the evaporating saturation temperature from the condensing saturation temperature. Label the two explicitly when transferring readings from a panel into a spreadsheet.
With condenser water leaving at 92°F and chilled water leaving at 44°F, fluid lift is 48°F. If the refrigerant condenses at 97°F and evaporates at 40°F, refrigerant-temperature lift is 57°F. The 9°F difference consists of a 5°F condenser approach plus a 4°F evaporator approach. Using entering condenser water minus leaving chilled water produces another water-temperature comparison; identify that basis explicitly rather than mixing it with the leaving-water calculation.
| Measurement basis | Readings in this example | Calculated lift |
|---|---|---|
| Leaving water | 92°F condenser; 44°F evaporator | 48°F |
| Refrigerant saturation | 97°F condensing; 40°F evaporating | 57°F |
Separate the weather effect from a growing approach
Trane's RTHD-SVX01J-EN service manual recommends cleaning condenser tubes when approach exceeds 10°F in standard water applications. Calculate that approach from the two condenser readings recorded for the lift comparison. The manual notes that glycol typically doubles the standard approach, so its 10°F water criterion does not transfer unchanged to a glycol circuit.
Suppose leaving condenser water remains 92°F but refrigerant condensing temperature rises from 97°F to 103°F. With evaporation unchanged at 40°F, refrigerant lift rises from 57°F to 63°F while fluid lift stays 48°F. The water-only calculation misses the deteriorating condenser approach. Add the two lift calculations to the chiller startup record, together with the water flow and load at which the approaches were measured.
Why an arrangement change alters compressor lift
Trane's 2018 Engineers Newsletter 47-3 uses leaving-water temperatures to calculate 61.9°F lift for parallel chillers and an average 54.05°F for series counterflow, a 12.7% reduction. These figures are water-temperature lift, not measured refrigerant saturation-temperature lift. The comparison changes the piping arrangement as well as the operating temperatures; it cannot be reproduced from chiller tonnage alone.
Distinctions
- Pressure ratio
- Absolute discharge pressure divided by absolute suction pressure is dimensionless. Neither a pressure difference nor a temperature difference supplies that ratio.
- Construction lift
- Earthwork, concrete and asphalt guides also use lift for a placed layer. Thickness and compaction records describe that separate meaning.
Frequently asked questions
Can I calculate lift from the two water temperatures on the BAS?
Yes, as fluid-temperature lift using the stated leaving-water endpoints. Keep it separate from refrigerant-temperature lift and trend both approaches.
Does a lower lift guarantee lower plant power?
Tower fans and pumps also consume power. Compare combined plant input at the delivered cooling load, as developed in the sequencing guide.
Sources checked
Also defined as
- Landscaping: A thin layer of fill, commonly 6 to 12 in loose, compacted before the next layer goes on
- Concrete: A horizontal layer of concrete placed and consolidated before the next layer goes on