ANVILFIELD Try FieldOS

Field glossary · property

Birdbath

A birdbath is a shallow basin in otherwise drained pavement. Flooding identifies its boundary; a straightedge or elevation grid measures the depth needed for repair quantities. First determine whether the low spot is local or whether a raised edge blocks the drainage route. A sport-court acrylic patch, an asphalt regrading repair and correction of settled base material address different causes.

A low spot in the finished patch that ponds water and pumps it into the joint

Used across 2 Anvilfield field guides, most in Paving.
Updated

Court screening and driveway diagnosis use different checks

The American Sports Builders Association’s 2023 Birdbaths position paper uses standing water deeper than 1/16 inch after drainage has ceased, or after one hour of drying in sunlight at 70 degrees F, to identify court birdbaths. Record the observation conditions with the marked water boundary. That court criterion does not become a driveway acceptance rule merely because both surfaces are asphalt.

Across a driveway or parking lot, extend the elevation survey beyond the puddle to the intended outlet. A depressed patch needs restored surface elevation; water backed up behind a raised perimeter needs its drainage path corrected. Repeated settlement at the same location points the repair investigation below the wearing surface. ASBA identifies subsoil, compaction, drainage, grading and paving errors among the causes of court birdbaths.

Separate binder gallons from finished patch volume

SportMaster publishes an Acrylic Patch Binder yield of approximately 7.75 square feet at 1/4-inch depth per gallon of binder when mixed with sand and cement. The gallon in that yield is binder, not a gallon of finished patch.

A 62-square-foot repair averaging 1/4 inch deep needs about 62 / 7.75 = 8 gallons of binder under SportMaster’s stated yield, before a job allowance. Its finished mixture volume is 62 x 0.25 / 12 = 1.292 cubic feet. The manufacturer’s yield already accounts for added sand and cement; finished patch volume is not liquid-binder volume. Use average depth across the basin, rather than its deepest reading, for a tapered repair.

Protect patch strength during mixing

SportMaster technical data sheet CMT-6 limits Acrylic Patch Binder mixing to 2 to 4 minutes and warns that overmixing can entrain excess air and reduce strength. A clean surface contour therefore does not establish that the patch mixture was prepared correctly.

Inspect the hardened patch edge as well as its center, then repeat the water observation. A raised feather edge forms a new rim beside the repaired area. The court resurfacing guide covers the later coating sequence; driveway installation addresses the wider pavement and drainage arrangement.

Distinctions

Blocked drainage path
Backwater from a raised perimeter or blocked outlet can cover correctly sloped pavement. A birdbath identifies a local depression, not every wet area.
Surface roughness
A rough texture can hold small water films without forming the connected basin associated with a birdbath.

Frequently asked questions

Why keep the original ponding map after repair?

It provides a location reference for the repeat observation and separates recurrence at the same depression from water retained along a new patch edge or elsewhere on the court.

Sources checked

Also defined as

  • A low spot in the surface that holds standing water after rain

Where this shows up

Related guides

Next step: Find recreation properties

Back to the full field glossary