ANVILFIELD Try FieldOS

Field glossary · material

Sealcoat

For parking-lot sealcoat, the estimating unit matters as much as the coating name: SealMaster specifies 0.11 to 0.13 gallon of mixed MasterSeal per square yard per coat, while its concentrate coverage uses a different basis. The finished coating contains the supplied emulsion plus job-added water, sand and additive. Identify that binder family and batch recipe before comparing gallons between bids or reconciling delivered concentrate with applied material.

A thin protective surface coating of coal tar or asphalt emulsion that blocks UV and water

Used across 2 Anvilfield field guides, most in Paving.
Updated

Concentrate coverage and mixed coverage use different gallons

SealMaster's MasterSeal Concentrate specification gives a mixed application rate of 0.11 to 0.13 gallon per square yard per coat. The same sheet estimates 100 to 120 square feet per gallon of concentrate per coat after proper mixing. Those figures describe different stages of the product and should not be inserted into the same takeoff equation.

A 45,000-square-foot lot contains 5,000 square yards. Two coats at 0.12 gallon per square yard per coat require 1,200 gallons of mixed material. Separately, the manufacturer's concentrate coverage range gives an ordering estimate of 750 to 900 gallons for two coats. These are parallel estimates, not a fixed concentrate-to-mixture conversion; reconcile the actual batch yield before ordering a top-up.

What belongs on a sealcoat batch ticket?

For each 100 gallons of MasterSeal concentrate, SealMaster's published mix recommendation lists 15 to 25 gallons of water, 300 to 500 pounds of sand and one to two gallons of its listed polymer additive. Sand loading is a mass quantity; adding its number to the liquid gallons does not calculate finished mixture volume.

SealMaster's sheet requires continuous agitation or mixing during application to maintain a homogeneous mixture. A tank-level reading without the batch proportions cannot show how much concentrate reached the lot. Record concentrate, water, sand, additive and the area receiving each coat, then reconcile the yield against the selected product specification. Measure each coat's area separately; an untreated island and a third coat at an entrance change the quantity without changing the overall lot boundary.

Identify the binder family from records, not surface color

USGS Fact Sheet 2011-3010 reports roughly 1,000 times greater polycyclic aromatic hydrocarbon (PAH) concentrations in coal-tar-based sealcoat products than in asphalt-based products. Coal tar and petroleum asphalt therefore identify different product chemistries despite a similar finished color. Preserve the actual product name and safety data sheet in the maintenance history.

Separate areas scheduled for patching from pavement ready for coating in the condition survey, and identify any later return to coat cured patches. Put product identity and batch yield alongside each treated area in the sealcoat work record, so the next maintenance cycle starts with a documented coating history.

Distinctions

Agency seal coat
Some road agencies use seal coat to mean a sprayed binder and chip-aggregate treatment. Confirm the treatment definition before applying parking-lot coating rates to a road pay item.

School districts and cities also buy sealcoating services: PorchRocket Bid Control lists their paving solicitations and records past contract awards for estimating the next public maintenance package.

Frequently asked questions

Can a gallon count prove that both coats met their rate?

Only with the product basis and measured area for each coat. A total for the whole job can hide a light second coat or an omitted section.

Sources checked

Also defined as

  • A thin protective surface coat applied after curing; maintenance, not structure

Where this shows up

Related guides

Next step: Fill route gaps

Back to the full field glossary