Application rate
A paving application rate needs a quantity basis as well as an area: gallons of sprayed liquid per square yard and gallons of residual asphalt per square yard describe different amounts. At constant flow, rate follows 9 x gallons per minute / (feet per minute x spray width in feet). Verify distribution across the bar separately from that average.
The volume of diluted material sprayed per unit area, commonly gallons per square yard, set by the product and the surface
Choose the liquid or residual test result
ASTM D2995-23 Option A evaluates the quantity and distribution of bituminous material delivered by a distributor, including differences across the bar and along its travel. ASTM D2995-23 Option B evaluates those differences on a residual-asphalt basis for emulsion applications. Write the option beside the reported result so two different material bases do not share an unlabeled number.
A residual result describes the binder remaining after water removal. Applied-liquid quantity also includes the water carried through the nozzles. Dilution changes the conversion between those quantities without changing the required residual binder.
Calculate gallons per square yard from flow and speed
With flow Q in gallons per minute, speed v in feet per minute and effective width w in feet, application rate in gal/SY is 9Q / (v x w). The factor 9 converts square feet to square yards. A distributor delivering 30 gallons per minute over 12 feet at 100 feet per minute covers 133.33 SY per minute and applies 0.225 gal/SY.
Increasing speed to 150 feet per minute while holding flow and width constant lowers the result to 0.150 gal/SY. An automatic rate controller changes flow to compensate for speed; compare its output with the measured swath rather than assuming constant flow.
A satisfactory total can conceal local misses
FHWA’s 2016 Tack Coat Best Practices recommends specifying residual asphalt so dilution does not obscure the intended binder quantity. Keep that basis explicit when preparing a fog-seal application record; the fog-seal product and project specification establish its own rate.
Compare collection results nozzle by nozzle before accepting the total. Excess beneath one nozzle can offset a missed strip beneath its neighbor in the inventory balance. Match each collection location to a nozzle, measure the active spray width and exclude unsprayed starts or stops from the area. Repeat the distribution test after a nozzle adjustment.
Distinctions
- Coverage yield
- Yield commonly expresses area per unit of material. It is the reciprocal of application rate only when coat count, material condition and units match.
- Winter deicer rate
- A mass rate such as pounds per lane-mile includes lane width implicitly. It cannot be compared directly with gallons per square yard.
Frequently asked questions
Can delivery tickets establish the application rate?
Tickets establish supplied quantity. A defensible applied rate also accounts for remaining material, transfers, waste, dilution and measured area. Local collection tests address distribution that the inventory balance cannot show.
Sources checked
Also defined as
- Landscaping: Material applied per area, in pounds per 1,000 sq ft for granular or gallons per area for liquid
- Mixed sealer per area, commonly about 0.15 to 0.22 gallons per square yard across two coats