Field glossary · business
SLA
An SLA, or service-level agreement, translates a service promise into a measurable obligation: what starts the clock, what result stops it, the measurement period, exclusions and the remedy. Acknowledging a call, arriving on site, restoring service and completing a permanent repair are different milestones. State each promised milestone separately so a fast acknowledgement cannot be reported as a completed restoration.
Service-level agreement, the response-time commitment and its remedy on a commercial contract
Write the clock before writing the response time
Define the accepted reporting channel, timestamp, severity, coverage hours and stop condition. With coverage from 8 a.m. to 5 p.m., Monday through Friday, a four-business-hour attendance promise starting Friday at 4 p.m. expires Monday at 11 a.m., assuming no holiday or pause. A four-elapsed-hour promise expires Friday at 8 p.m. Record the coverage calendar and approved pauses with the incident.
FAR 37.601, in the FAC 2026-01 text, requires performance-based federal service contracts to include measurable performance standards and a method for assessing performance. A maintenance SLA uses the same practical discipline when it identifies the timestamp source and the event that satisfies each commitment. The federal provision applies to its stated procurement context.
Translate availability percentages into minutes
Availability = (eligible minutes - unavailable minutes) / eligible minutes × 100. A 30-day month contains 43,200 minutes. At 99.9 percent availability, the corresponding unavailable time is 43.2 minutes; at 99.99 percent it is 4.32 minutes. Use the agreement’s actual eligible time and outage definition in a claim.
AWS’s Amazon Compute SLA commits to 99.99 percent region-level monthly availability for the specified deployment across multiple Availability Zones. AWS’s single-instance commitment is 99.5 percent. The deployment and outage definitions determine the applicable commitment; combining both percentages into one service promise loses those conditions.
Connect the missed target to its remedy
AWS requires an SLA credit claim by the end of the second billing cycle after the incident, supported by incident times, affected resource identifiers and request logs. Its credits are calculated from eligible affected service charges. Put the claim deadline beside the availability target so a verified outage does not become an expired claim.
For field service, record the incident ID, received time, acknowledgement, arrival, restoration, pauses and closure. Separate restoration achieved with a temporary measure from the permanent repair. Specify the covered work in the maintenance agreement and collect the promised event timestamps through dispatch scheduling. Link the records rather than asking dispatchers to reconstruct them at renewal.
Distinctions
- Maintenance frequency
- A planned service interval states when work recurs. An SLA states the measurable performance promised when a defined condition occurs.
Frequently asked questions
Does a four-hour SLA guarantee a repaired system?
Only when restoration or repair is the defined four-hour endpoint. An attendance commitment ends at arrival; an acknowledgement commitment ends earlier. The named event determines what was delivered.
Is facility Tier certification an SLA?
No. A facility classification and a provider’s service promise answer different questions. Keep the certified infrastructure scope separate from the contractual availability calculation.
Sources checked
Also defined as
- Datacenter: The service level agreement defining uptime, power, response, and the service credit owed when the provider misses
- Landscaping: Service level agreement, the contracted response time and bare-pavement standard