Field glossary · business
Colocation (colo)
Colocation supplies the facility services around customer-owned IT equipment, with the purchased service defined by the provider's order and operating terms. Compare the power allocation, network handoff and energy-meter boundary separately. A cabinet reservation does not by itself establish usable kilowatts, Internet transit or a particular treatment of cooling overhead. Those details determine what the customer can install and how the service is accounted for.
Renting space, power, and cooling in a provider's data center while you own and operate the gear inside it
Convert a kVA power allocation before counting usable kW
Equinix's colocation power documentation defines its deployment Draw Cap in kVA, irrespective of customer power factor. Apparent power and real power therefore need separate columns in a capacity comparison. Real power in kW equals kVA multiplied by power factor at the same operating condition.
A 10 kVA allocation with equipment operating at 0.95 power factor corresponds to 9.5 kW of real power. At 0.90 power factor it corresponds to 9.0 kW. Neither calculation changes the contractual kVA ceiling. Use measured or specified operating power factor when translating the allocation, rather than copying a kVA amount into a column labeled kW.
A cross-connect is a physical handoff
Equinix describes Cross Connects as connections between customer deployments and service providers or other customers within its facilities. Its documentation states that new Cross Connect orders have supported single-mode fiber only since March 31, 2024, when copper and multimode orders were discontinued. This is a provider-specific ordering rule, not a definition of all colocation cabling.
Keep the fiber handoff, connector type, endpoints and service provider with the order. A physical cross-connect reaches the far endpoint; the Internet, private-network or other service running over that connection has its own scope. Confirm which party orders each side and which equipment port terminates it before treating a completed cross-connect as an activated network service.
Place cooling overhead on the energy-meter diagram
EPA ENERGY STAR's colocation guidance describes metered tenant energy billing with an added overhead amount for cooling and power delivery. Compare the overhead basis with the location of the tenant energy meter. A multiplier applied to IT energy and an inclusive facility-energy measurement describe different boundaries.
For 20 MWh of metered IT energy, an agreed 1.35 overhead multiplier produces 27 MWh on that accounting basis, including 7 MWh attributed to overhead. A comparison sheet for the colocation fit-out order should therefore show the 20 MWh meter total and the 1.35 contract factor in separate fields. Keep a measured site PUE in a third field with its own boundary and reporting period; substituting it for the agreed billing factor changes the contract calculation.
Distinctions
- Cloud service
- With a cloud service, compute capacity is the purchased deliverable. With colocation, the order instead needs the customer's equipment inventory, facility allocation and network handoff; the operator of that customer equipment can itself sell cloud services.
- Power allocation and energy use
- kVA or kW describes capacity; kWh or MWh describes consumption over time. A proposal needs the units beside each commitment.
Frequently asked questions
Does a cross-connect include Internet access?
The physical connection and the network service are separate items. Identify the far-end provider and the activated service associated with the handoff.
Is a 10 kVA commitment the same as 10 kW?
They are equal at unity power factor. At 0.95 power factor, 10 kVA corresponds to 9.5 kW of real power.
Sources checked
Also defined as
- A multi-tenant facility renting space, power, and cooling to customers who bring their own gear