Field glossary · business
Pull-through
Pull-through is separately sold work traced to a maintenance agreement through an equipment finding or service relationship. Its revenue multiplier divides additional-work revenue by planned agreement revenue for the same customers and period. A 1.5 multiplier means $1.50 of additional work per $1 of maintenance revenue. Included tasks, unsold recommendations, and separately billed repairs need distinct records to keep that ratio reproducible.
The repair, replacement, and upgrade revenue that flows from maintenance visits, measured as a ratio to agreement dollars held
Give each repair one originating agreement
ServiceTitan's October 15, 2026 pull-through documentation permits only one service agreement to be linked to each job or estimate and directs users to select the agreement that generated the opportunity. That is a useful attribution rule for any service ledger: identify the originating agreement, equipment, finding, and resulting job before totaling the revenue.
A property with several agreements needs that relationship at the job level. The same repair should not appear under a site agreement, an equipment agreement, and a portfolio agreement as three separate sales. Preserve the originating relationship when a repair estimate becomes a replacement job. ServiceTitan's July 2026 release notes describe carrying the agreement link through that conversion.
Included maintenance cannot also be additional work
ServiceTitan treats a job as either a planned agreement visit or pull-through work; the same job cannot fulfill both categories in that workflow. For operating reports, use a similarly clear boundary between the work purchased by the agreement fee and separately authorized repairs.
A belt included in the maintenance scope stays in planned delivery cost. A separately approved motor replacement belongs to additional work. In the ServiceTitan workflow above, a visit that does both needs separate planned-visit and pull-through jobs. Allocate the shared travel time once, then assign each task's labor and materials to its job. Match the split to the exclusions in the maintenance agreement scope.
Calculate the multiplier from completed work
ServiceTitan posts linked estimate revenue and cost to completed pull-through work after the estimate is sold and the job is completed. An unsold recommendation remains an opportunity, even when it is valuable evidence of future workload.
ServiceTitan's actual planned-revenue column uses invoiced revenue from completed planned visits. Use that denominator when reproducing its report; an accounting ledger's earned revenue or an agreement's annual face value can produce a different ratio.
For the same agreement cohort and reporting year, take $120,000 invoiced for completed maintenance work and $180,000 invoiced for completed, separately sold repairs and replacements. The pull-through multiplier is $180,000 / $120,000 = 1.5. Combined revenue is $300,000, or 2.5 times maintenance revenue. Label the 1.5 additional-work ratio and the 2.5 combined ratio separately.
Another $90,000 in open recommendations does not change the completed-work ratio. Retain it in the opportunity report, with proposal status and originating finding. The recurring service business guide explains why the relationship creates that pipeline; this calculation separates the pipeline from delivered sales.
Read repair margin beside the revenue ratio
ServiceTitan calculates pull-through gross margin percentage as additional-work revenue minus its associated cost, divided by that revenue. With $180,000 in repair revenue and $126,000 in associated direct cost, gross profit is $54,000 and gross margin is 30%.
A replacement-heavy year can raise the revenue multiplier while consuming more material, subcontracting, or labor. Show the maintenance margin and additional-work margin separately before combining them. That makes a high sales ratio distinguishable from a profitable delivery program.
Distinctions
- Pull-through stall or conductor path
- In charger layouts and electrical work, pull-through describes physical movement or routing. Those uses do not measure maintenance-generated sales.
Frequently asked questions
Does a repair for an agreement customer always count as pull-through?
Use the documented attribution rule. A sale to the same customer is not enough when another contract, sales campaign, or unrelated equipment generated the job. Link the finding and agreement that actually produced the work. Unbilled warranty correction contributes cost, not additional sales.
What if planned agreement revenue is zero?
Report the additional-work dollars and leave the multiplier uncalculated. Division by zero does not produce a meaningful sales ratio. Keep the agreement identifier and work dates so the dollars enter the correct cohort when planned revenue is reported.
Sources checked
Also defined as
- The repair and replacement revenue a maintenance visit generates beyond the agreement fee