Raveling
Raveling is diagnosed by aggregate leaving a pavement's surface and the affected footprint growing or deepening. FHWA's LTPP method records asphalt raveling in square meters without severity classes. For pervious concrete, track that surface loss separately from infiltration: a pavement can pass water readily while losing its aggregate skeleton. Identify the pavement material before choosing a test or treatment.
Loose aggregate shedding from the surface, the leading pervious failure, from bad paste, low compaction, or poor curing
How to record asphalt raveling
FHWA's LTPP Distress Identification Manual, fifth revised edition, 2014 describes asphalt raveling progressing from fines loss to missing coarse aggregate and a pitted wearing surface. Record which particles are missing and whether binder loss accompanies them; a rough original texture alone does not establish that progression.
FHWA's LTPP raveling survey measures affected square meters, assigns no severity levels, and excludes chip seals from this rating. Name the survey method on the condition sheet rather than borrowing low, medium, or high labels from another pavement-rating system. A chip-seal aggregate-loss investigation needs its own surface-treatment criteria.
Separate stone loss from poor drainage
A pervious pavement can drain readily while its surface sheds stone. Conversely, an intact surface can infiltrate poorly because its voids are clogged. Record raveling and infiltration as separate conditions; a satisfactory result for one does not accept the other.
ASTM C1701/C1701M-17a(2023) states that its measured infiltration rate applies only to the local area tested. It also states that the method does not measure the effect of sealed voids near the bottom of the slab. Multiple test locations and selected core observations answer different drainage questions.
For the surface-loss survey, outline the affected area, identify whether loss is concentrated at joints, tire paths, turning areas, or an entire placement, and record the depth relative to adjacent intact material. Sweep loose debris before documenting the exposed skeleton so the record does not confuse stockpiled grit with missing pavement.
The former drum-abrasion test is not an acceptance test
ASTM lists C1747/C1747M-13 as withdrawn in 2022 with no replacement. It must not be presented as a current ASTM method for accepting a pervious-concrete placement.
The published C1747 scope also states that it was not intended for mixture qualification or jobsite acceptance and that no correlation with field performance had been established. It compared the potential degradation resistance of laboratory mixtures; it did not reproduce field problems such as delayed curing or inadequate compaction.
NRMCA CIP 38 recommends continuing curing of pervious concrete through seven days to develop paste strength against raveling. Its 2018 discussion still references C1747, so the later ASTM withdrawal must be read alongside that older guidance rather than overlooked.
Quantify the loss before selecting a treatment
A turning area measures 4 by 3 meters, giving a 12-square-meter mapped footprint. At the next survey its connected loss area measures 18 square meters, a 6-square-meter or 50% increase. Use the same reference points and survey boundary so that growth is distinguishable from a change in mapping. Record additional weak material discovered in cores or removal separately from the visible-loss footprint.
Identify whether the loss affects pervious concrete or an asphalt pavement before specifying a binder or surface treatment. A product that holds loose stones in place but closes connected voids changes the drainage function of pervious pavement.
Distinctions
- Clogging
- Clogging fills the connected voids and reduces drainage. Raveling removes particles from the pavement skeleton.
- Scaling
- Scaling removes surface mortar in flakes. Raveling is recognized by aggregate becoming loose and leaving the surface.
Frequently asked questions
Does a high infiltration rate prove pervious concrete is sound?
It establishes local water passage under the test conditions. It does not measure the strength of the bonds holding surface aggregate in place.
Can I require C1747 for current ASTM acceptance?
ASTM withdrew that method in 2022, and its published scope expressly excluded jobsite acceptance. Use the project's approved acceptance criteria and current applicable methods.