Stone reservoir

A stone reservoir is a buried aggregate storage bed whose usable water volume is the space between particles. In the Minnesota Stormwater Manual's calculation, a 12-inch bed with porosity 0.40 stores 4.8 inches of water over its footprint, not 12 inches. The aggregate envelope, water storage, and credited runoff reduction are separate quantities: outlet elevation and drawdown determine how much stored water leaves through soil and how much leaves through a pipe.

The clean open-graded stone layer under the surface that stores water in its voids and spreads load

Used across 2 Anvilfield field guides, most in Paving.
Updated

How much water does the stone bed hold?

The Minnesota Stormwater Manual calculates storage for a reservoir without an underdrain as depth times porosity times the average of its top and bottom areas. For a rectangular bed with vertical sides, that reduces to V = A × D × n, where A is square feet, D is feet, and n is the interparticle void fraction.

Take a 10,000 sq ft footprint, 18 inches of reservoir depth, and n = 0.40. The stone envelope occupies 15,000 cu ft, while its voids hold 6,000 cu ft of water. Using the full excavated volume as storage would overstate capacity by 9,000 cu ft. Separate bedding and other layers when their dimensions or void contents differ.

Use porosity in the storage calculation

Porosity n divides void volume by total bed volume. Geotechnical void ratio e divides void volume by solid-particle volume, giving n = e / (1 + e). Thus e = 0.40 corresponds to n = 0.286, while n = 0.40 corresponds to e = 0.667. A schedule labeled void ratio needs its denominator identified before the value enters a storage worksheet.

The Minnesota manual's permeable-pavement credit calculation explicitly defines n as cubic feet of voids per cubic foot of reservoir. In the 15,000 cu ft bed above, entering e = 0.40 as though it were n would claim 6,000 cu ft instead of about 4,286 cu ft. Carry the denominator into the aggregate submittal so the storage calculation can be checked against the reported test result.

What does the aggregate void test actually measure?

ASTM C29/C29M-23 determines aggregate bulk density in a loose or compacted condition and calculates the percentage of voids between particles. Ask for the tested condition along with the result. A dry bulk-density figure and an aggregate specific-gravity basis are what connect the submitted stone to its calculated interparticle space.

ASTM C29/C29M-23 reports bulk density on a dry basis; moisture in a delivery or stockpile changes its mass-to-volume relationship. Truck weight alone therefore does not establish reservoir void content. Keep the test report attached to the delivered gradation and source, then use surveyed installed dimensions for the volume. The pervious concrete guide addresses the separate surface mix and placement controls.

Available storage changes between storms

Minnesota's Stormwater Manual limits permeable-pavement storage credited under its construction-stormwater framework to a maximum 48-hour drawdown, with 24 hours recommended for trout-stream discharges. An empty-bed calculation needs a matching drainage record. A surface infiltration test measures entry through the pavement; an observation well shows the water level remaining below it.

In the 10,000 sq ft bed above, water still occupying the bottom 6 inches fills 2,000 cu ft of void space at n = 0.40. Only 4,000 cu ft remains below the top of the 18-inch reservoir. Relate that water level to the surveyed underdrain and overflow elevations when diagnosing repeated ponding. The permeable pavement guide covers the surrounding system.

Distinctions

Storage above an underdrain versus infiltration storage
Minnesota's credit method distinguishes water captured by an underdrain from water stored beneath a raised underdrain that infiltrates into soil. Its MIDS calculator assigns no volume-reduction credit to a permeable pavement with an underdrain at the reservoir bottom. Physical detention space and runoff-reduction credit therefore belong on separate calculation lines.

Frequently asked questions

Is 40 percent void space the same as 40 percent absorption?

The storage calculation concerns water between aggregate particles. Particle absorption concerns water entering the stone itself. Specify the interparticle void fraction for the reservoir calculation.

Can I calculate reservoir depth from storm volume alone?

Storm volume establishes a hydraulic storage need. The completed section also needs the structural depth for its traffic, a drainage path, and elevations that leave the intended storage usable. Preserve both the pavement section and hydraulic calculation.

Sources checked

Also defined as

  • Concrete: Open-graded crushed-stone layer under the slab that stores water while it infiltrates into the soil