ANVILFIELD Try FieldOS

Field glossary · measurement

Infiltration rate

An infiltration-rate result is a water depth per time tied to a tested layer and footprint, commonly reported in inches per hour. A pavement ring test measures local surface intake; a soil test supplies a different design input. Minnesota's 2023 Construction Stormwater Permit halves field-measured soil rates for design. At 1.0 inch per hour measured, the design calculation therefore starts with 0.5 inch per hour, not the pavement's surface reading.

How fast water moves into the soil or through the surface, in inches or millimeters per hour

Used across 2 Anvilfield field guides, most in Paving.
Updated

Which infiltration test belongs to which surface?

ASTM C1781/C1781M-21 adds ring-positioning and sealing provisions for joints between paving units; ASTM C1701/C1701M-17a(2023) uses a ring on continuous pervious concrete. Identify the pavement construction before selecting the method, then record the exact ring location. Calling a timed pour an infiltration test does not establish which interface it measured.

ASTM C1781/C1781M-21 treats each result as local and calls for multiple locations to characterize the pavement. Preserve the individual readings as well as their average. An inlet receiving sediment and an open area beside it can produce very different results; the average alone hides the maintenance boundary.

Surface intake and soil design rate need separate records

ASTM C1701/C1701M-17a(2023) states that its surface test does not measure the effect of voids sealed near the bottom of the slab and identifies core inspection for that condition. A fast top-surface result therefore cannot clear a suspected blockage lower in the concrete.

Minnesota's Construction Stormwater Permit MNR100001, issued August 1, 2023, requires dividing field-measured soil infiltration rates by two for design in item 16.11. Item 16.8 requires the infiltration system to pass all stormwater routed to it, including volume above the water-quality volume, through the uppermost soil or engineered-media surface within 48 hours. These are Minnesota permit criteria; record the measured soil rate and the reduced design rate separately.

Calculate drawdown from the stored water depth

At a measured soil rate of 1.0 inch per hour, Minnesota's factor produces a design rate of 0.5 inch per hour. A reservoir holding 12 inches of water-equivalent storage over that same infiltrating footprint takes 24 hours to drain at that design rate, before additional inflow. Water-equivalent depth is stored volume divided by bottom area; it is not the full stone-layer thickness.

Mark the tested soil horizon and elevation on the porous pavement section, then keep the pervious concrete surface test on a separate line. That makes the drainage path traceable from slab intake to reservoir storage and finally into the native soil.

Distinctions

Air infiltration
HVAC infiltration describes uncontrolled air leakage and uses airflow or air changes per hour. It is a separate quantity from stormwater entering soil.

Frequently asked questions

Is inches per hour the same as gallons per minute?

An infiltration rate is normalized by area. A rate of 0.5 inch per hour over 1,000 square feet equals 41.67 cubic feet per hour, or about 5.2 gallons per minute. That conversion assumes the stated rate acts across the entire footprint.

Sources checked

Also defined as

  • Concrete: How fast water passes through the in-place slab, measured per ASTM C1701 in inches per hour

Where this shows up

Next step: Locate stormwater maintenance sites

Back to the full field glossary