PICP
PICP moves stormwater through stone-filled joints between concrete pavers into an underlying reservoir; the pavers themselves remain solid. CMHA recognizes systems that infiltrate into soil and lined systems that drain through pipes. Its maintenance guidance calls for cleaning below 20 inches per hour in consistently slow ponded areas, or below 40 inches per hour on slopes over 2%. Surface entry, storage, and outlet performance need separate checks.
Permeable interlocking concrete pavement; open-graded stone layers that infiltrate water instead of shedding it
Solid pavers, permeable joints, and the right standard
CMHA PAV-TEC-018-22 identifies ASTM C936 as the U.S. product specification for PICP concrete pavers. The current edition is ASTM C936/C936M-26. ASTM C1782/C1782M-26 covers segmental concrete paving slabs; it is not a designation that makes a product permeable.
Keep unit compliance separate from the joint and reservoir specification. A pallet certificate establishes the stated product properties, while the completed joint geometry and aggregate determine the surface water path. The porous and permeable pavement guide describes the larger pavement choices.
PICP can operate without subgrade infiltration
CMHA PAV-TEC-018-22 recognizes full-infiltration, partial-infiltration, and no-infiltration PICP configurations. A lined system can admit water at the surface, store it in the aggregate reservoir, and release it through pipes. Its surface remains permeable even though infiltration into the soil is intentionally prevented.
Trace the complete water path on the section drawing: entry through joints, storage in stone, and discharge into soil or through an outlet. A surface infiltration result cannot establish that the reservoir outlet works. Conversely, slow native soil does not by itself rule out a system designed for piped discharge.
Maintenance thresholds depend on surface slope
CMHA PAV-TEC-023-20 calls for immediate surface cleaning when measurements in ponded areas consistently fall below 20 inches per hour. For PICP surfaces sloping over 2%, CMHA PAV-TEC-023-20 calls for immediate cleaning when surface infiltration falls below 40 inches per hour. These are maintenance triggers, distinct from a project's new-pavement acceptance requirement.
A 25-inch-per-hour result on a 3% slope falls below the cited sloping-surface trigger even though it exceeds 20 inches per hour. Record slope beside the test result; otherwise the maintenance decision loses one of its inputs.
ASTM C1781/C1781M-21 treats the measured infiltration rate as local to the test position and calls for multiple locations when characterizing an entire pavement. It also supports repeat measurements at marked locations to track change. Separate a deteriorating entrance from clean stalls in the maintenance map; averaging them together could hide the location that needs cleaning.
Municipal pavement renewal appears in capital plans before tender, and PorchRocket Bid Control tracks those early signals alongside paving solicitations for estimators building a permeable-pavement bid schedule.
Distinctions
- Pervious concrete
- Water passes through interconnected pores in a cast concrete matrix. PICP routes water between discrete solid units.
- Conventional sand-set paving
- A sand bedding and joint system does not become PICP simply because it contains concrete pavers that meet C936.
Frequently asked questions
Does a fast surface test prove the whole system drains?
It measures surface entry at the test location. Reservoir storage, subgrade infiltration, underdrains, and outlets remain separate parts of the hydraulic assessment.
Sources checked
Also defined as
- Paving: Permeable interlocking concrete pavement, solid units with open stone-filled joints