Field glossary · material
Polymeric sand
Choose polymeric joint sand by the named product's permitted joint geometry and base assembly. GATOR MAXX G2 needs at least 1 1/2 inches of joint depth, with a maximum width of 4 inches over a traditional base or 2 inches over an overlay. Alliance Gator assigns those assemblies different rain-safe windows, 15 minutes and 24 hours respectively. A dry surface crust proves neither activation depth nor readiness for traffic.
Joint sand with a binder that hardens when wetted; resists washout but hazes if installed wet or dirty
Joint dimensions belong to a named product
Alliance Gator specifies a minimum joint width of 1/8 inch and a minimum depth of 1½ inches for GATOR MAXX G2. Its maximum joint width is 4 inches over a traditional base and 2 inches in an overlay assembly. These limits identify the product's application range, not a dimensional rule for every polymeric sand.
Measure available joint depth after accounting for material already in the gap. A deep paver with only a shallow cleared joint does not supply the advertised installation depth. Document the narrowest and widest joints as well as the available depth before ordering a product for irregular stonework. Alliance Gator also requires the cured joint surface at least 1/8 inch below the paver top or below its chamfer, keeping the joint out of direct tire and foot contact.
Rain-safe time changes with the base assembly
Alliance Gator lists GATOR MAXX G2 as rain safe 15 minutes after activation over a traditional base, compared with 24 hours for overlay applications. The same bag therefore carries materially different weather windows depending on what lies under the paving.
Record the assembly with the weather window on the work plan. An overlay over concrete is not interchangeable with paving over a draining aggregate base. The hardscape installation guide supplies the installation context; the selected manufacturer instructions establish the activation and drying sequence.
Rain resistance, readiness for traffic, and readiness for sealer are separate milestones. Write each applicable interval under its own label. Using the shortest advertised interval as a general release time obscures which condition the manufacturer actually tested or specified.
Verify activation below the crust
Techniseal's HP NextGel data sheet, revised February 20, 2022, requires checking that activation reaches at least 75% of joint depth before stopping the watering sequence. Open a representative joint for the depth check; appearance at the top alone cannot establish the activated depth.
For a 2-inch joint, 75% activation is 1½ inches. A damp layer only ½ inch deep represents 25% of that joint, even if the surface looks uniformly wet. Restore the checked location using the product's instructions and preserve the measured depth in the installation record.
Judge a soft joint against its drying history and the actual depth condition. Adding more water to a joint that is already activated but still wet addresses a different problem from insufficient activation. The diagnosis needs the installation record, not just the surface texture.
Distinctions
- Ordinary jointing sand
- Unbound joint sand relies on granular interlock without the polymeric binder. Its maintenance and water response differ from a curing joint product.
- PICP joint aggregate
- Permeable pavement uses an open water path through specified joint aggregate. A binding sand substitution changes that path.
Frequently asked questions
Can polymeric sand cover a shallow layer of old joint sand?
For a GATOR MAXX G2 repair, Alliance Gator calls for removal of the existing joint material and at least 1 1/2 inches of installation depth. Confirm the recessed finished joint level too; nominal paver thickness is not the usable joint depth.