ANVILFIELD Try FieldOS

Field glossary · property

Scaling

Concrete scaling is a surface-mortar loss classified by depth and exposed aggregate; NRMCA describes moderate scaling as roughly 3 to 10 mm of mortar loss with aggregate showing. Map the affected area and measure against adjacent intact concrete before estimating removal. Deicer history, hardened air-void examination, and the depth of sound substrate help distinguish a deteriorated wearing layer from damage extending through the slab.

Flaking of the top 1/8 to 3/16 in from freeze-thaw and deicers on under-aired or over-finished concrete

Used across 2 Anvilfield field guides, most in Concrete.
Updated

Describe severity by what has been lost

NRMCA CIP 2 describes moderate scaling as exposed aggregate with roughly 1/8 to 3/8 inch, or 3 to 10 mm, of surface mortar loss. Light scaling leaves coarse aggregate covered; severe scaling leaves aggregate prominently exposed. That classification is broader than treating every scaled surface as a uniform thin peel.

Measure from adjacent intact surface to the remaining mortar, and record whether the coarse aggregate is still firmly embedded. Separate isolated popouts from broad mortar loss. Photographs need a scale and a location, because oblique sunlight can make shallow texture look much deeper than it is.

On 100 square feet of affected slab, an average measured loss of 1/4 inch represents about 2.08 cubic feet of missing surface material. That arithmetic describes existing loss. The eventual repair volume includes the additional depth needed to reach a sound bonding surface.

Use hardened-concrete evidence to test the air-void question

ASTM C457/C457M-24 measures parameters of the hardened concrete air-void system used to investigate susceptibility to freeze-thaw damage. An original fresh-air test and a hardened sample answer different questions, particularly when consolidation and finishing changed the surface layer.

Choose samples that preserve the damaged surface and comparable sound areas from the same placement. Keep finishing, curing, exposure, and deicer history with the samples. A compressive-strength result alone does not describe the distribution of protective air voids near the wearing surface.

A withdrawn test and a deicer distinction

ASTM C672/C672M-12 was withdrawn in 2021 without replacement. Older specifications and reports still cite its deicer-scaling test, but it should be identified as a withdrawn method rather than the current ASTM standard.

NRMCA CIP 2 advises against ammonium sulfate, ammonium nitrate, and magnesium-based salts as concrete deicers. Record the actual product used, not simply "salt," when comparing deterioration between treated and untreated areas.

Index air-void samples to damaged and intact locations on the same placement. A sample taken only from the sound interior cannot describe a mortar layer already lost at the surface. Use the defect map to show that sampling limitation alongside the measured loss depths.

Distinctions

Mineral scale
Mineral scale in plumbing or cooling equipment is deposited material. Concrete scaling is loss of material from the concrete surface.
Spalling
A spall is a localized break or detached piece, often extending deeper or involving a joint or reinforcing bar. Map its cause and depth separately.

Frequently asked questions

Does scaling always prove that the whole slab is weak?

No. Surface mortar and the underlying concrete can have different conditions. Depth-resolved examination establishes how far the deterioration extends.

Will a sealer replace the lost surface?

A penetrating treatment does not rebuild the missing mortar. Any repair must first establish the sound substrate and the required finished elevation.

Sources checked

Also defined as

  • Flaking of the concrete surface caused by freeze-thaw intensified by deicing salts

Where this shows up

Related guides

Next step: Find exterior maintenance accounts

Back to the full field glossary