Field glossary · property

Entrained air

Entrained air is the deliberately stabilized bubble system used for concrete freeze-thaw durability. A pressure-meter result includes entrained and entrapped air outside the aggregate particles; it does not count protective bubbles separately. MoDOT's 2026 field manual subtracts the aggregate correction from the apparent reading: 6.8% minus 0.4 percentage point is 6.4% air. Hardened microscopic analysis answers a different question by measuring the void system remaining after placement and curing.

Deliberate microscopic air bubbles that give freezing water room to expand, for in-service freeze-thaw durability

Used across 2 Anvilfield field guides, most in Concrete.
Updated

Subtract aggregate correction from a pressure reading

ASTM C231/C231M-26 requires determination of an aggregate correction factor because the reported concrete air content excludes air within aggregate particles. MoDOT's 2026 Concrete Field Manual expresses the calculation as sample air content = apparent meter air content - aggregate correction factor. Retain both readings rather than entering only the uncorrected dial value.

An apparent reading of 6.8% with a determined correction of 0.4 percentage point gives 6.4% concrete air content. That is subtraction of percentage points, not a 0.4% reduction of 6.8. Identify the aggregate source and mixture represented by the correction, and record the sampling point within the air-entrained placement.

Foam can invalidate the rollameter result

ASTM C173/C173M-26 invalidates a volumetric test when the foam above the liquid occupies more than two percentage points on the meter's air scale. Repeat the test with more isopropyl alcohol during initial filling. The cutoff for adding alcohol to suppress foam is the initial filling to the zero mark, not the moment a final reading is established.

A persistent foamy neck is therefore a test-quality problem, not evidence that the delivered concrete has excessive entrained air. Preserve the invalid result as such and report the valid repeat separately. This matters particularly on the porous-aggregate mixtures discussed in the lightweight concrete guide, where the volumetric method supplies the air result.

What hardened void analysis can identify

ASTM C457/C457M-24 does not provide a definitive separation of entrained, entrapped and water voids because their size and shape characteristics overlap. Its microscopic measurements describe air content, specific surface, void frequency, spacing factor and paste-air ratio. A laboratory report assigning every void to an origin needs to state the classification convention it used.

Keep fresh total-air content and hardened void measurements under separate property names in the investigation record. Compare the microscopic report with the original mixture and sampling location, including whether the fresh sample was taken before or after pumping. Keep that evidence with the surface-defect diagnosis rather than deciding the cause of scaling from the delivery ticket alone.

Distinctions

Air entrainment
The process creates and stabilizes the bubble system; entrained air is the resulting property. Neither term means the percentage of liquid air-entraining admixture dosed into the batch.
Entrained air in hydronic water
In a circulating-water guide this means bubbles carried by the fluid. It does not identify a concrete durability system or an admixture requirement.

Frequently asked questions

Is a change from 6% air to 5% a 1% loss?

It is a loss of one percentage point of concrete volume, or one sixth of the original air volume. Use percentage points when discussing changes against an air-content target.

Sources checked

Also defined as

  • The intentional fine air system, very small bubbles, that protects the paste from freezing pressure

Where this shows up