Field glossary · material

Non-chloride accelerator

A non-chloride accelerator advances concrete setting or early strength without using intentionally added chlorides as its accelerating ingredient. Specify its chloride declaration separately from its performance class: ASTM C494 Type C or E alone does not establish chloride suitability. A usable order also identifies the product, dose per cement mass, concrete temperature, and strength or set-time milestone being purchased.

A set accelerator without chloride, used in reinforced and post-tensioned concrete to avoid corroding the steel

Used across 2 Anvilfield field guides, most in Concrete.
Updated

ASTM Type C or E does not certify chloride suitability

ASTM C494/C494M-24 classifies accelerating admixtures as Type C and water-reducing accelerators as Type E. The same specification expressly states that compliance does not by itself establish an admixture's acceptability for reinforced concrete when chloride content is an issue.

Read the chloride declaration separately from the performance classification. Also distinguish initial set from early compressive strength. Earlier finishing does not establish that a slab has reached the strength needed for loading or that a formed member can carry its next construction load.

ASTM C494/C494M-24 recommends supplementary tests with the cement, supplementary cementitious materials, aggregates, admixtures, and batching conditions proposed for the work. A result obtained with another cement source does not establish the same acceleration for the delivered mixture.

A named product provides a usable dosing range

SikaSet NC product instructions recommend 10 to 45 fluid ounces per 100 pounds of cement for accelerating set. Sika also directs adjustment of mixing water when the dose is 16 fluid ounces per 100 pounds or greater. Those product-specific quantities should appear on the batch calculation, not be converted into an informal number of cans per truck.

For a 10-cubic-yard load containing 600 pounds of cement per yard, a selected dose of 20 fluid ounces per 100 pounds requires 1,200 fluid ounces, or 9.375 US gallons, of admixture. The selected dose exceeds Sika's water-adjustment trigger. Use the supplier's approved calculation for the admixture's contribution rather than treating the entire liquid volume as pure water.

The Sika dosage is stated against cement mass. If a supplier uses a different dosing basis for a blended binder, reconcile that basis in the approved mixture and dispenser setup instead of silently substituting total powder mass. SikaSet NC instructions require separate dispensing when other admixtures are used and prohibit mixing the accelerator with dry cement.

Compare the strength milestone at the planned temperature

Build the comparison around the required operation: finishing, form removal, stressing, or opening to traffic. Record mixture identity, actual concrete temperature, dose, and the measured strength at the planned decision time. A warm laboratory control and a cold field placement do not measure the same schedule benefit.

Keep the dose calculation with the admixture submittal and the measured temperature with the cold-weather protection record. Together they show which delivered mixture produced the measured acceleration and which thermal conditions accompanied it.

Distinctions

Corrosion inhibitor
An inhibitor is selected to reduce corrosion activity. Accelerating concrete without adding chlorides is a different function.
Antifreeze claim
Accelerated hydration and early strength do not eliminate the need for the specified cold-weather curing and protection conditions.

Frequently asked questions

Does non-chloride mean the concrete contains zero chloride?

No. Chloride also enters through other mixture constituents. The admixture declaration and the total concrete chloride calculation answer different questions.

Is twice the dose twice as fast?

No. Cement chemistry, temperature, other admixtures, and the selected performance measure affect the response. Qualify the proposed dose rather than extrapolating a straight line.

Sources checked

Also defined as

  • An accelerator with no added chloride, safe near reinforcing and prestressing steel

Where this shows up