Field glossary · material
VMA
VMA has two trade meanings. In concrete it means viscosity-modifying admixture, a chemical addition used to control mixture stability and handling. In asphalt it means voids in mineral aggregate, a calculated volume percentage in the compacted mixture. Read the units before interpreting the value: a liquid dosage per hundredweight of cementitious material and an asphalt volumetric result describe entirely different quantities.
Viscosity-modifying admixture, which thickens the paste to hold the aggregate in suspension
Dose MasterMatrix VMA 362 by total cementitious weight
Master Builders Solutions' MasterMatrix VMA 362 data sheet recommends 2 to 14 fl oz per 100 lb of cementitious material, with up to 14 fl oz/cwt for SCC stability and up to 6 fl oz/cwt for other mixtures needing more body for pumping or finishing. Those are product-specific liquid dosages, not a percentage of the concrete volume.
For a mixture containing 600 lb/yd3 of total cementitious material and an approved dose of 4 fl oz/cwt, the addition is 24 fl oz/yd3. An 8 yd3 batch takes 192 fl oz. Dosing against only 400 lb/yd3 of portland cement while ignoring the other 200 lb/yd3 would deliver 16 fl oz/yd3, one third short. The denominator is the one specified for this product; transfer neither its dose nor its batching basis to another admixture without that product's data.
Resting behavior and frozen product are different problems
The MasterMatrix VMA 362 data sheet describes increased viscosity when the concrete rests without agitation and says remixing restores workability. It also specifies storage above 32°F and below 130°F and states that frozen product cannot be reconstituted by thawing. A reversible fresh-concrete response is distinct from irreversible damage to stored admixture.
Record the product, lot, storage history and actual dispensed quantity when tracing a sudden change in SCC behavior. ASTM C494/C494M-24 includes Type S for specific-performance admixtures; that classification is not a VMA dose or an assurance that every Type S product performs the same function. Keep the product's approved use with the SCC mixture record.
Asphalt VMA uses aggregate bulk specific gravity
FHWA's December 2010 review of specific-gravity measurements calculates asphalt VMA as 100 - (Gmb x Ps / Gsb), with Ps expressed as the aggregate percentage by total mixture mass. Gsb is aggregate bulk specific gravity; Gmb is compacted mixture bulk specific gravity. Substituting maximum theoretical mixture gravity changes the calculation's physical meaning.
With Gmb = 2.400, Ps = 95.0 and Gsb = 2.650, VMA is 100 - (2.400 x 95.0 / 2.650) = 14.0%, rounded to one decimal place. FHWA's LTPP data guide reports VMA to the nearest 0.1%. Carry the source gravity values into the asphalt mix-design review so a disputed VMA can be recalculated instead of argued from a rounded summary.
Separate asphalt VMA from air voids
FHWA-HIF-11-033 calculates air voids from 100 x (1 - Gmb/Gmm), whereas VMA uses Gsb and the aggregate mass percentage. For the mixture above, let Gmm = 2.500: air voids are 4.0%, while VMA is 14.0%. FHWA defines effective binder volume as VMA minus air voids, giving about 10.0% of mixture volume here. Thus a 14.0% VMA result does not mean that 14.0% of the compacted pavement is air.
Distinctions
- cwt
- In the cited US admixture dosage, this is 100 lb of cementitious material. Fluid ounces measure the liquid addition; they are not ounces of admixture mass.
- Gmm
- Maximum theoretical mixture specific gravity is used in other asphalt volumetrics. It is not the aggregate bulk specific gravity Gsb used in the cited VMA equation.
Frequently asked questions
Does a 14% VMA on an asphalt report mean 14% admixture?
No. It is a compacted-mixture volume result calculated from the aggregate and mixture gravities and aggregate mass percentage. A concrete VMA addition belongs on a separate admixture dosage record.
Sources checked
- Master Builders Solutions MasterMatrix VMA 362 data sheet, July 2023: dosage, remixing and storage limits
- ASTM C494/C494M-24: current chemical-admixture specification and Type S
- FHWA-HIF-11-033, December 2010: specific-gravity measurements and asphalt volumetric equations
- FHWA-HRT-06-068, 2006, Chapter 4: VMA inputs and reporting precision
Also defined as
- Paving: Voids in the mineral aggregate, the space holding air plus effective binder; minimum by NMAS
- Viscosity-modifying admixture, thickens the paste to resist segregation and washout