ANVILFIELD Try FieldOS

Field glossary · material

SCC

SCC means self-consolidating concrete, placed by its own flow and assessed for filling, passing, and stability. A 650 mm slump flow paired with 630 mm J-ring flow has a 20 mm passing difference; the same slump flow paired with 590 mm has a 60 mm difference. ASTM C1621 places those results in good and poor passing bands respectively, despite their identical unconfined spread.

Self-consolidating concrete, flows and fills under its own weight with little or no vibration

Used across 2 Anvilfield field guides, most in Concrete.
Updated

The same spread can hide very different passing ability

ASTM C1621/C1621M-17(2023) interprets a slump-flow minus J-ring-flow difference below 25 mm as good passing ability and a difference above 50 mm as poor passing ability. The two measurements must use the same cone orientation; changing the setup changes the comparison.

Two loads each produce 650 mm unconfined slump flow. The first produces 630 mm with the J-ring, a 20 mm difference. The second produces 590 mm, a 60 mm difference. Their spread without an obstruction is identical, but the first falls in the cited good-passing band and the second in the poor-passing band.

ASTM C1621/C1621M-17(2023) limits its application to SCC with nominal maximum aggregate size no greater than 25 mm. Record aggregate size and test configuration beside the result rather than transferring those thresholds to another mixture or an improvised ring.

Visual stability is an observation, not a separate strength grade

ASTM C1611/C1611M-21 places its visual stability ratings and relative-viscosity procedure in a nonmandatory appendix. A project can specify those observations as part of acceptance, but the test-method title alone does not supply a universal pass/fail requirement for them.

Photograph the spread and record any mortar halo, central aggregate pile, or bleeding when the test is made. Those observations explain why a numerical spread was accepted or investigated. They do not replace the specified hardened-strength and durability requirements.

Choose a segregation test that fits the decision time

ASTM C1610/C1610M-24 evaluates potential static segregation by comparing coarse aggregate in the top and bottom of a column specimen and excludes SCC containing lightweight aggregate. ASTM also identifies its timing as potentially too slow for a preplacement field decision. Arrange the test during mixture development or the planned quality program, with its aggregate scope identified on the request.

A result for static settlement and a result for passing through reinforcement describe different failure mechanisms. A cohesive mix can still block at a restriction, and an easily passing mix can still lose uniformity while standing in a deep form.

The testing schedule for an SCC placement should identify the decision each result supports and when it is needed. Record slump-flow measurements beside passing and stability results, preserving the distinction between spread, obstruction response, and settlement.

Distinctions

Slump flow
Slump flow measures unconfined spread. It does not directly measure the ability to pass through reinforcement.
Static segregation
Static segregation is separation while the mixture stands. Passing ability concerns movement through a restriction.

Frequently asked questions

Is a 650 mm spread enough to accept SCC?

Only if the project's complete acceptance requirements are met. The worked comparison shows that the same spread can accompany either good or poor passing ability.

Is a visual stability index automatically mandatory under C1611?

Its procedure is in a nonmandatory appendix. The project specification establishes whether the observation and a particular acceptance limit are required.

Sources checked

Also defined as

  • Self-consolidating concrete, also called self-compacting concrete

Where this shows up

Related guides

Next step: Find manufacturing properties

Back to the full field glossary