JMF

JMF means job mix formula, the versioned asphalt production record tying sieve targets, binder content and component sources to a particular plant and approval. It tells the technician which target belongs beside a production result. A 5.6% binder test is 0.2 percentage point above a 5.4% target but only 0.1 point above a revised 5.5% target, so changing the reference changes the reported deviation.

Job mix formula, the approved recipe with target gradation, binder content, and volumetrics, plus tolerance bands

Used across 2 Anvilfield field guides, most in Paving.
Updated

Read the targets before using the approval stamp

Caltrans' Construction Manual, Section 39, November 2024, requires acceptance of proposal form CEM-3511 with design-data form CEM-3512 and accepted verification form CEM-3513 attached. Those records connect the proposed targets, the laboratory evidence and the agency's verification. A target-gradation sheet by itself leaves that chain incomplete.

Read the package by identity: project, producer, plant, mix designation, component sources, revision and approval. Then match the production and sampling records to it. The mix-design guide explains how the proportions are selected; the document package establishes which approved selection the plant is producing for this job.

Read each sieve value as percent passing or individual percent retained exactly as the form labels it. Binder percentage also needs its stated mass basis, and laboratory volumetrics need their specified compaction level. Put those units and bases beside the targets on the production worksheet. A number detached from its basis cannot be compared reliably with a quality-control result.

Verification has a date

Caltrans' November 2024 Construction Manual gives JMF approval a 24-month life and measures verification currency against the planned start of HMA production. A verification signed October 15, 2024 is outside that window for production starting November 5, 2026. Moving the paving date therefore changes the approval check even when the aggregate sources and binder remain the same.

Caltrans Section 4-3902D(1) calls for verification results within 20 days of receiving all samples. Its Type A and rubberized-HMA provisions also address the sampling schedule, including a 3-business-day verification route for rubberized HMA when requested in writing by the contractor. Carry the applicable milestones into the paving schedule instead of treating every verification as the same 20-day wait.

JMF1, JMF2 and JMF3 identify different production stages

TxDOT's 2024 Item 341 uses JMF1 for the laboratory design, JMF2 for the approved recipe developed from the trial batch for Lot 1, and JMF3 for the approved recipe for Lot 2. Section 4.4.2.1.17 requires later adjustments to be supplied in writing and numbered sequentially before the new lot begins. Those stage names are TxDOT's system, separate from the Caltrans approval forms.

TxDOT Item 341, Table 11 limits the current JMF's binder-content change from JMF2 to ±0.3 percentage point. With a JMF2 target of 5.4%, that particular adjustment band runs from 5.1% to 5.7%. The adjustment band controls the proposed target change; it does not accept every production test that falls inside those endpoints. Record the approved current target separately from its allowable adjustment range.

Keep test data tied to the revision

Caltrans' JMF Verification Tool stores submitted sample and test-result data in DIME, its Data Interchange for Materials Engineering system. The tool supports Type A HMA, rubberized HMA gap-graded mixtures and open-graded friction course. That shared record connects the proposal to its supporting results rather than leaving the verification in a detached email attachment.

Preserve the previous revision, the replacement approval and the first production lot governed by the change. A binder result of 5.6% retains its original +0.2-point deviation from a 5.4% target even after a 5.5% target takes effect. Recalculating the old result as +0.1 point would erase the basis used for the original acceptance decision.

Distinctions

Mix designation
A designation identifies the specified mixture class. Separate producers, plants or approved revisions can supply that class through different formulas.
Quality control plan
The QCP assigns sampling, testing, responsibilities and responses. The JMF identifies the material targets and sources those activities track. Retain both documents in the production package.

Frequently asked questions

Does changing the date on a JMF renew its verification?

No. Renewal depends on the agency's verification and acceptance process. Preserve the signed verification date so the production start can be checked against the actual approval window.

Which JMF belongs with a disputed production sample?

Use the approved revision in force when the sampled material was produced. Preserve the sample identifier and the lot's actual production time; neither a newer approval nor a matching mix designation changes the target applicable to that sample.

Sources checked

Also defined as

  • Job mix formula, the approved project recipe with its production tolerances

Where this shows up