ANVILFIELD Try FieldOS

Field glossary · material

RAP

RAP means reclaimed asphalt pavement, a recycled feedstock whose dry mass includes both stone and aged asphalt binder. At 5 percent binder content, 200 dry tons of RAP carry 10 tons of binder. Wet stockpile tonnage cannot be entered directly as dry feed: moisture changes the belt-scale correction, while binder-content and recovered-aggregate tests determine what the material contributes to the new mixture.

Reclaimed asphalt pavement, the milled or crushed existing asphalt reused as aggregate and a binder source

Used across 3 Anvilfield field guides, most in Paving.
Updated

How many stockpile samples establish consistency?

FHWA-HRT-11-021 recommends at least five individual samples, preferably ten or more, to characterize the consistency of a RAP stockpile. Test portions individually before making the representative composite used for mixture design. Combining everything first gives an average but conceals the variation the sampling program was intended to reveal.

Keep sample identifiers tied to the pile and sampling locations. Fine and coarse portions of the same stockpile need not carry the same binder content. Label the composite with the recycling stockpile identity and retain its individual sample results so an average cannot conceal an inconsistent pile.

Moisture correction changes the dry feed rate

FHWA-HRT-11-021 calls for measuring virgin-aggregate and RAP moisture daily during production, or as needed, and entering the result into continuous-plant controls to correct belt-scale feed. Rain on the stockpile therefore changes the material balance as well as the drying demand.

With moisture reported as 5 percent of dry mass, a wet RAP feed of 21 tons per hour contains 20 dry tons per hour and one ton per hour of water. Treating all 21 tons as dry feed overstates RAP by one ton per hour. Record the moisture convention; a percentage based on wet mass requires different arithmetic.

Measure binder content before assigning binder credit

ASTM D8159-19 determines binder quantity by automated extraction and permits the recovered aggregate to be used for sieve analysis. Its extracted binder can also be recovered for further testing. An aggregate grading result and a binder-content result are complementary outputs from the recovered material.

For a 1,000-ton mixture containing 200 dry tons of RAP with 5.0 percent binder, the RAP carries 10 tons of binder. That is one percentage point of the total mixture mass. The laboratory still needs the recovered binder properties and the approved blending assumptions before that quantity becomes a complete mixture design. Carry the figures into the plant production record, where the feed rate can be reconciled to the designed recipe.

Distinctions

RAP percentage versus binder contribution
RAP percentage counts its aggregate and binder together. Binder contribution counts only the asphalt carried by that RAP; in the 1,000-ton example, 20 percent RAP contributes 1 percent of mixture mass as reclaimed binder.

Frequently asked questions

Can I use the grading of unextracted millings as RAP aggregate grading?

Unextracted particles can be binder-bound agglomerations. Use the specified recovered-aggregate method so the JMF reflects the aggregate that actually contributes to the blended grading.

Sources checked

Also defined as

  • Reclaimed asphalt pavement, the milled material, recycled into new mix
  • Reclaimed asphalt pavement, milled old asphalt reused in a new mix

Where this shows up

Related guides

Next step: Map recycling customers

Back to the full field glossary