Cold milling / cold planing
Cold milling, also called cold planing, removes pavement without heating it and leaves a surface whose texture depends on the cutting drum. For its W 220 Fi, Wirtgen lists an 8 mm fine drum with a 100 mm maximum cut, compared with a 30 mm maximum for the micro-fine configuration. An estimate needs both the removal geometry and the proposed drum; specifying depth alone leaves the finish unresolved.
Grinding off the existing asphalt with a rotating toothed drum, no heat, to a set depth and slope
Standard, fine and micro-fine drums leave different surfaces
Wirtgen's W 220 Fi brochure lists standard drums with 15 or 18 mm tool spacing, a fine drum with 8 mm spacing and a micro-fine configuration with 6 by 2 mm spacing. Those are machine configurations, not a universal classification by cut depth. Show the drum configuration alongside the milling grade references on the work plan so texture and elevation have separate acceptance records.
For the W 220 Fi configurations in that brochure, Wirtgen lists maximum cutting depths of 350 mm for standard drums, 100 mm for the fine drum and 30 mm for the micro-fine drum. The tighter texture comes with a different cutting envelope. Request the proposed drum specification with the milling plan, especially when the next treatment is too thin to bury a coarse pattern.
Tool spacing is not ridge-to-valley depth
Wirtgen's milling-drum technical page identifies tool spacing and maximum milling depth as separate selection variables and lists 3 to 6 mm spacing for its micro-fine drum family. Spacing is the lateral arrangement of cutting tracks. Ridge-to-valley depth is a measured surface result, influenced by tooth condition, travel speed and the cutting pattern.
An acceptance record should distinguish a transverse texture measurement from a longitudinal grade measurement. A fine-looking pattern can still carry a long depression. Conversely, a cut at the right average elevation can leave excessive local ridges. Record each against its own specified tolerance and measurement direction.
An extra quarter inch changes the removal quantity
Across a 12-foot-wide, 1,000-foot-long pass, an additional 0.25 inch of cut removes 250 cubic feet, or 9.26 cubic yards, beyond the planned quantity. That increase exists before the loose cuttings expand in a truck. Use surveyed cut geometry for the in-place volume and the contract measurement method for payment. A truck's loose volume includes bulking; its scale weight requires a measured or specified in-place density before it can verify the surveyed removal volume.
Keeping asphalt cuttings separate from base excavation also preserves their identity as RAP. A deeper cut that enters granular support changes both the rehabilitation scope and the recovered material stream; it is not merely another truckload of the same milling product.
Distinctions
- Cold in-place recycling
- Recycling processes and stabilizes the removed material into another course. Milling alone removes it and leaves the remaining surface for a separate treatment.
Private resurfacing estimates start with a property inventory: PorchRocket Ground Control selects commercial buildings with visible parking lots and delivers the list as CSV or Excel within 48 hours.
Frequently asked questions
Does micro milling mean a thinner overlay is automatically acceptable?
The drum controls removal texture. The replacement mix still needs its own approved lift thickness, profile and structural design.
Sources checked
Also defined as
- Removing a controlled thickness of pavement with a rotating toothed drum