Field glossary · measurement
t/NMAS
Calculate t/NMAS for each compacted asphalt lift as thickness divided by nominal maximum aggregate size, with both dimensions in the same units. For a 19 mm mix, NCAT's recommended minimum ratios translate to 57 mm for fine gradation and 76 mm for coarse gradation. A 2-inch lift is only 50.8 mm, giving 2.67 and falling below both recommendations. The calculation must follow local thickness through tapers, not the combined thickness of multiple courses.
Lift-thickness-to-NMAS ratio; a minimum near 3 (fine) to 4 (coarse) sets the thinnest lift that will compact
Put both dimensions in the same units
NIST's exact international-foot definition gives 25.4 mm per inch, so t/NMAS = 25.4 × compacted inches / NMAS in millimeters. Treat a mix designation as a designation: converting the trade label 1/2-inch to 12.7 mm instead of using a stated 12.5 mm job mix formula changes the denominator. Enter the millimeter size from the approved mix sheet.
For a 19 mm mix, 2 inches gives 50.8 / 19 = 2.67, while 3 inches gives 76.2 / 19 = 4.01. Changing the thickness by one inch changes the placement geometry substantially. Additional roller passes do not change that geometric ratio. The NMAS entry explains the aggregate-size designation.
Translate the research minimum into actual thickness
NCAT Report 19-07's fine-graded minimum of 3 means 57 mm for a 19 mm mix; its coarse-graded minimum of 4 means 76 mm for that same nominal size. The 19 mm difference comes from gradation rather than a change in stone-size designation. Record the mix's fine or coarse classification beside the calculated thickness so the reviewer can reconstruct which recommendation was used.
A 9.5 mm mix at a ratio of 4 calculates to 38 mm, or about 1.50 inches. A 12.5 mm mix at that same ratio needs 50 mm, or about 1.97 inches. Compare actual metric dimensions rather than rounding both courses to the same convenient inch label. Resolve the selected gradation and compacted course thickness together in the submittal.
Check the thin end of a transition
A planned 3-inch course of 19 mm mix has t/NMAS about 4.01. Where that course tapers to 1 inch at a tie-in, the local ratio becomes 25.4 / 19 = 1.34. Passing the recommended ratio in the main lane establishes neither taper suitability nor compliance with the project's placement specification. A milling transition, different leveling material, or revised detail needs to resolve that thin section before placement.
Calculate each lift independently. Two 1-inch courses of 19 mm mix each have a ratio of 1.34, even though their combined thickness is 2 inches. The mill-and-overlay guide covers elevation coordination; this calculation identifies where the proposed course runs out of room for its aggregate.
What proves density through a thick lift?
NCAT's 2022 report verified compaction through 7- to 8-inch experimental lifts using cores sliced to examine density at the top, middle, and bottom. That is a different question from whether a surface gauge reports an acceptable reading. Retain depth-resolved density evidence when the thick-lift design relies on full-depth compaction.
The same research tracked ride quality as well as density and used diamond grinding or a thin surface course to improve the finished ride. A favorable ratio answers the aggregate-clearance question; density and smoothness still require their own acceptance measurements. Temperature planning belongs in the compaction-window guide.
Frequently asked questions
Should I use loose screed thickness in t/NMAS?
A loose thickness of 2.5 inches and a finished thickness of 2 inches produce ratios of 3.34 and 2.67, respectively, for a 19 mm mix. Use the finished 2.67 value for the lift check. Record the screed setting separately from the accepted compacted thickness.
Does a ratio of four guarantee passing density?
Density still depends on mixture properties, temperature, support, and the rolling operation. The ratio screens placement geometry; cores or the specified density method establish the finished result.
Sources checked
- NCAT, spring 2022: Paving Thick Lifts for Deep Rapid Rebuilds, minimum ratios and sliced-core density verification
- NCAT Report 19-07, February 2020: FHWA Demonstration Project for Enhanced Durability of Asphalt Pavements through Increased In-Place Pavement Density, Phase 3, lift-thickness discussion
- NIST Guide to the SI, Appendix B: exact international-foot definition and conversion basis
Also defined as
- Lift-thickness-to-nominal-maximum-aggregate-size ratio that sets the thinnest lift that will compact
- Ratio of lift thickness to NMAS; a minimum near 3 (fine) to 4 (coarse) is commonly specified