Tack coat
A tack coat must create a continuous bond at the paving interface, so correct total gallons do not establish correct application. Caltrans' 2024 guidance pairs nozzles angled 15 to 30 degrees with spray-bar height that provides overlapping fans. Inspect the full-width pattern for dry stripes and heavy bands. Material sampling, distributor spread measurement and interface condition are separate evidence needed to explain whether the new course bonded.
A light asphalt-emulsion spray that bonds the new overlay to the existing surface so the layers act as one
Spray-bar setup determines where the binder goes
Caltrans' April 2024 Tack Coat Guidelines show spray nozzles angled between 15 and 30 degrees and a bar height that produces double or triple coverage. Those settings concern the geometry of overlapping spray fans, not an instruction to double or triple the specified liquid rate.
With nozzle spacing, opening and pressure held constant, raising or lowering the bar changes the overlap at the pavement. Inspect the test pattern across the complete working width. A dark center strip and light margins identify a distribution problem that an average tank drawdown cannot locate. Mark streak locations in the tack application record before they disappear beneath the overlay.
Sample the material separately from measuring its spread
Caltrans' 2024 guidelines direct sampling after one-third and before more than two-thirds of the distributor load has been discharged. That samples material during the working portion of the load rather than treating a first-nozzle dribble as representative. Preserve the material identification and sample time with the application record.
The same guidelines identify California Test 339 for distributor spread-rate measurement. The material sample establishes what was supplied; a measured collection area establishes how much was applied there. Neither record replaces the other. Tie them to the same load and pavement section so the delivered residue can be reconciled to the measured application. Subtract the empty collection pan's mass before dividing by the collection area; the container is not part of the applied material.
Read the core interface when an overlay slips
FHWA-HIF-16-017 identifies asphalt-to-concrete overlays as tack-coat applications, along with asphalt-to-asphalt interfaces. The substrate material therefore belongs in the inspection record and rate selection. A concrete surface under an asphalt overlay is not an automatic reason to omit tack.
When investigating slippage, preserve the interface and the failure plane from each core. Distinguish a clean separation at the interlayer from fracture within an asphalt course. Record where the sample sat relative to a spray streak, truck wheel path or puddled area. A few dry strips can govern local bond failure even while the lot-wide gallon calculation passes.
For a 24-foot spray width with two feet of ineffective coverage at each outside edge, four feet, or one-sixth of the width, receive the deficient pattern. Recalibration of total gallons alone does not establish that those edge bands are repaired. Use the paving inspection guide to carry the corrected pattern into the accepted work.
Distinctions
- Prime coat
- Prime treats a granular foundation before surfacing. Tack on existing concrete beneath an asphalt overlay is still an interlayer bonding treatment.
Frequently asked questions
Is tack coat always an asphalt emulsion?
No. FHWA's tack-coat brief also identifies performance-graded asphalt binder as a tack material. Product identity determines heating, handling and application calculations.
Does double spray coverage mean twice the specified tack rate?
No. Double or triple coverage describes overlapping nozzle fans. Caltrans requires the resulting application to be checked separately for its spread rate, so adjust the distributor to deliver the specified total through that overlap pattern.
Sources checked
Also defined as
- A thin sprayed asphalt emulsion that bonds a new asphalt layer to the asphalt surface below it
- Asphalt emulsion on the walls and bottom that bonds the new patch to the old pavement