Field glossary · material
Asphalt emulsion
An asphalt emulsion is specified by droplet charge, setting class and residual binder properties; CSS-1h identifies a cationic, slow-setting dispersion made with relatively hard asphalt. Its water content makes the sprayed liquid quantity larger than the binder quantity left behind. Grade, storage temperature and dilution notation belong on the same delivery record because each changes how a crew stores, applies or accounts for the material.
Asphalt carried as droplets suspended in water; it breaks and loses the water to set, with no heat needed to place it
Decode CSS-1h without confusing viscosity and hardness
The MnDOT Bituminous Manual identifies C as cationic, with a positive particle charge; anionic emulsions carry a negative charge. Its naming guide uses SS for slow setting, MS for medium setting and RS for rapid setting. The setting designation describes interaction and breaking behavior, rather than a promised number of minutes on every surface.
MnDOT identifies 1 as the lower-viscosity emulsion grade and 2 as the higher-viscosity grade, while h denotes a harder base asphalt. Accordingly, CSS-1h combines cationic charge, slow setting, relatively low emulsion viscosity and hard residual binder. A thin liquid in the distributor does not mean a soft asphalt residue. Specify the complete grade when ordering either tack or prime; the word emulsion alone leaves charge, setting and residue unresolved.
Storage temperatures are part of the product identity
AEMA's publicly available storage chapter, revised March 2004, lists 50 to 140°F storage for SS-1, SS-1h, CSS-1 and CSS-1h, compared with 125 to 185°F for CRS-1 and CRS-2. These are grade-specific storage bands, not pavement application temperatures. A yard storing both families needs separate setpoints and records.
AEMA states that freezing breaks an emulsion into asphalt and water layers and advises against forced-air agitation. Heating a frozen tank does not recreate the original manufactured dispersion. Inspect tank temperature history, segregation and skin formation when a load behaves differently from previous deliveries, rather than correcting a damaged material by adding water.
What a dilution suffix tells the inspector
MnDOT's manual describes CSS-1h d30 for tack as seven parts original emulsion and three parts added water, with dilution performed by the manufacturer. That suffix is additional information about delivered material, not a different residual binder grade. A full ticket should preserve both the base grade and the dilution notation.
In a 1,000-gallon d30 blend, 700 gallons are the original emulsion and 300 gallons are added water. The original 700 gallons already contain water. Recording the blend as 70 percent asphalt would overstate the binder content. Carry the certified residue and the delivered dilution basis into the residual-rate calculation.
Distinctions
- Cutback asphalt
- A cutback uses a petroleum solvent to reduce binder viscosity. Water dilution instructions for an emulsion do not apply to it.
Frequently asked questions
Does the h in CSS-1h mean high viscosity?
No. It identifies a harder base asphalt. The numeral 1 identifies the lower emulsion viscosity category.
Does d30 mean 30 percent asphalt?
In MnDOT's tack designation it means a manufacturer blend of seven parts original emulsion and three parts added water. The asphalt fraction still comes from the residue content of that original emulsion.
Sources checked
Also defined as
- Asphalt droplets suspended in water; sprayed brown and turning black as it breaks and leaves an asphalt film