Approach
Approach is a temperature gap whose reference points depend on the equipment: a tower delivering 85°F water into 78°F entering-air wet-bulb conditions has a 7°F approach. On a water-cooled chiller, 95°F saturated condensing refrigerant and 90°F leaving condenser water give a 5°F approach. Write the two readings beside the result; the same word describes different comparisons, and the maintenance limit belongs to the particular machine and operating conditions.
The difference between condensing refrigerant temperature and leaving condenser-water temperature; a rising condenser approach points to fouling or non-condensables
Read a 4°F maintenance allowance correctly
YORK's YMC2 Model A Operations Guide, Form 160.78-O1, April 2025, limits the increase in condenser approach to 4°F above the recorded new-unit difference. Apply the 4°F allowance to the increase from the startup baseline. The guide also identifies the displayed condenser saturation temperature as a calculation from the condenser pressure transducer.
A clean recorded approach of 2.5°F and a later reading of 7.0°F represent a 4.5°F increase, exceeding that YORK allowance by 0.5°F. Match load and water flow to the original readings before applying this comparison. Add those conditions to the chiller startup record so the next inspection has a usable reference.
Why a tower rating contains three temperatures
The 2024 ASHRAE Handbook, HVAC Systems and Equipment, defines a nominal cooling-tower ton at 3 gpm cooled from 95°F to 85°F with 78°F entering wet-bulb. Applied to that rating point, the two subtractions describe different parts of tower operation.
SPX Cooling Technologies' thermal paper TR-016, issued April 2016, explains that measurement errors become especially significant when testing approaches below 5°F. A specification for a close approach therefore needs a measurement arrangement as carefully selected as the tower. Preserve the manufacturer's selection with the tower commissioning results, including the entering-air measurement locations.
| Quantity at the ASHRAE rating point | Calculation | What it describes |
|---|---|---|
| Water range | 95°F - 85°F = 10°F | Cooling of the circulating water during one pass |
| Tower approach | 85°F - 78°F = 7°F | Gap remaining between cold water and entering-air wet-bulb |
Separate inlet-air conditions from weather-station readings
Measure the air the tower actually receives. With 85°F cold water, an inlet wet-bulb of 80°F gives a 5°F approach. Substituting a remote weather-station wet-bulb of 78°F produces 7°F. The full 2°F shift comes from the reference location alone.
Record remote ambient and tower-inlet wet-bulb separately when discharge recirculation is suspected. The first describes the surrounding weather; the second belongs in the tower approach calculation. This distinction separates an air-path problem from the tower's thermal response to the air entering it.
Carry temperature differences through the controls correctly
NIST Special Publication 811 distinguishes temperature conversion from temperature-interval conversion. A 7°F interval equals approximately 3.9°C. Apply the 5/9 scale factor without subtracting 32, which belongs to conversion of an absolute Fahrenheit reading. A controls trend should retain the two original temperatures alongside the calculated interval so a swapped point, changed unit or sensor offset remains visible.
For condenser approach calculated as refrigerant saturation temperature minus leaving-water temperature, a water sensor reading 0.5°F high makes the result 0.5°F low. Thus a sensor offset can mimic the improvement expected after cleaning. Compare the transmitter and reference instrument at the same location, then retain both readings with the calculated approach.
Distinctions
- Subcooling
- For saturated refrigerant at 95°F, liquid refrigerant at 92°F and leaving condenser water at 90°F, subcooling is 3°F while condenser approach is 5°F. Recording the liquid-line reading separately prevents substitution of one measurement for the other.
Frequently asked questions
Why did approach fall when the building load dropped?
SPX TR-016 identifies heat load, tower size and airflow as governing variables. At reduced heat rejection, the tower can deliver water closer to entering wet-bulb without any cleaning or repair. Compare that point with the manufacturer's performance curve at the recorded flow and load.
Sources checked
- YORK YMC2 Model A Operations Guide, Form 160.78-O1 (425), April 24, 2025: operating logs and approach allowance
- ASHRAE Handbook 2024, HVAC Systems and Equipment, Chapter 40: cooling-tower design conditions
- SPX Cooling Technologies TR-016, April 2016: approach, load and measurement sensitivity
- NIST Special Publication 811, 2008 edition, Appendix B: temperature and temperature-interval conversion factors
Also defined as
- Datacenter: How close the tower can bring the water to the outdoor wet-bulb; sets the waterside free-cooling threshold
- Datacenter: The gap between the temperature a unit produces and the ambient wet-bulb