Field glossary · measurement
Cycles of concentration
A cycles-of-concentration result is incomplete without its sample pair and measured constituent. DOE's boiler example divides 100 ppm silica in boiler water by 10 ppm in feedwater to report 10 cycles. Replacing mixed feedwater with makeup in that denominator changes the result when condensate is returned. For towers, compare paired conductivity readings with the same-period makeup and discharge totals to distinguish concentration control from missing water accounting.
The ratio of dissolved solids in the boiler water to those in the makeup water, controlled by blowdown
Name the reference water before calculating cycles
DOE FEMP's steam-boiler guidance calculates cycles using an inert constituent such as silica or chloride in boiler water divided by its concentration in feedwater. Its published example uses 100 ppm silica in the boiler and 10 ppm in the feedwater to obtain 10 cycles. The sample location is part of the number's meaning.
Suppose makeup contains 20 ppm of a retained tracer and mixes in equal mass proportions with condensate containing none. The mixed feed contains 10 ppm. Boiler water at 200 ppm then represents 20 cycles relative to feedwater but 10 relative to makeup. Both ratios describe the same plant; changing the denominator changed the reported result.
Label the result as boiler/feedwater or boiler/makeup and keep the constituent name beside it. This adds the sampling boundary to the treatment discussion in the boiler water chemistry guide. Use samples representing the actual blended feed when condensate recovery or makeup sources change.
Use water meters to test the chemistry result
DOE FEMP's cooling-tower guidance recommends comparing the makeup-to-blowdown volume ratio with the blowdown-to-makeup conductivity ratio; disagreement is a reason to look for leaks or unaccounted withdrawals. The volume comparison assumes the measurements cover the same operating period and that stored water is not materially changing.
A tower sample at 3,000 µS/cm against makeup at 600 µS/cm indicates five conductivity cycles. Over the same steady operating interval, 10,000 gallons of makeup and 1,600 gallons of metered blowdown give a meter ratio of 6.25. The two results do not describe the same accounted water balance.
Using five cycles as the concentration estimate gives 2,000 gallons of total concentrated-water discharge: 10,000 divided by five. Subtracting the metered 1,600 gallons leaves 400 gallons to reconcile through drift, overflow, leakage, other withdrawals, or measurement error. That calculation locates missing accounting; it does not identify a particular leaking component.
Keep conductivity, dissolved salts, and solids separate
DOE describes makeup divided by blowdown as an approximate cycles relationship because other water-loss paths affect the balance. Conductivity also represents the combined electrical response of dissolved ions, so chemical additions or a change in makeup blend can alter its relationship to a particular retained salt.
A defensible log contains paired sample locations, the measured constituent or conductivity, the reporting basis, makeup and discharge totals, and inventory changes. Compare readings with the same temperature compensation. The tower commissioning guide connects the operating target to the approved treatment program.
DOE FEMP identifies side-stream filtration as a suspended-solids measure and makeup or side-stream softening as a way to address calcium and magnesium limits on cycles. A filter's clearer discharge does not demonstrate removal of the dissolved tracer used in a cycles calculation. Retain that distinction when specifying a treatment change intended to raise the operating target.
Distinctions
- Concentration versus concentration cycles
- The five-cycle tower result above uses 3,000 µS/cm divided by 600 µS/cm. A chloride-based result would instead need chloride measurements from both sample points; substituting a chloride ppm reading for either conductivity reading would invalidate the comparison.
Frequently asked questions
Why did boiler cycles change after recovering more condensate?
The mixed feed became more dilute. Recalculate using paired boiler and feedwater samples and retain the same reference basis when comparing before and after.
Do five cycles mean the water made five trips around the tower?
No. Cycles express a concentration ratio. Pump circulation rate does not count how many times evaporation has concentrated a particular gallon.
Sources checked
Also defined as
- Datacenter: Ratio of dissolved minerals in the circulating water to the make-up water; higher cycles cut blowdown
- Datacenter: How many times makeup water is concentrated before blowdown dumps it