Makeup

Cooling-tower makeup is incoming water recorded by the supply meters, including purchased water and recovered condensate. At five cycles of concentration, a tower evaporating 10,000 gallons per day needs 12,500 gallons per day of makeup when drift and other losses are negligible. That is the volume to budget separately from the condenser pump's recirculating flow. Compare supply totals, metered blowdown and concentration measurements over the same period to find water leaving outside the intended discharge path.

Fresh water added to replace evaporation, drift, and blowdown

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Draw the meter boundary around every supply

Include each water source entering the tower: the utility connection, recovered condensate and any other makeup supply. A meter on only the purchased-water branch cannot report total tower makeup when another source also feeds the basin. Label each meter by the branch it measures and retain the start and finish readings for the same reporting period.

DOE's Cooling Tower Management BMP recommends metering both makeup and blowdown and comparing their volume ratio with the blowdown-to-makeup conductivity ratio. Read the meters over the same period and record basin level. A basin refill adds stored water rather than operating consumption. Use temperature-compensated conductivity readings from both streams. The tower operation guide identifies the water circuits served by those meters.

How much makeup does five cycles require?

Using the steady water balance described in Veolia's Water Handbook, makeup M = E x C / (C - 1), where E is evaporation and C is cycles of concentration, with drift and other losses excluded. At E = 10,000 gallons per day and C = 5, makeup is 12,500 gallons per day and blowdown is 2,500 gallons per day. Over 24 hours, makeup averages 8.68 gpm. The fill valve needs capacity for its actual refill duty; this daily average is a water-budget quantity.

What does EPA's 10% water-balance screen show?

EPA's WaterSense at Work cooling-tower guidance flags possible leaks, overflow or excessive drift when makeup divided by blowdown exceeds the conductivity-based concentration ratio by more than 10%. Unmetered concentrated-water loss raises the volume ratio above the concentration ratio.

Take a stable operating period with 12,000 gallons of total makeup, 2,000 gallons of metered blowdown, makeup conductivity of 600 µS/cm and circulating-water conductivity of 3,000 µS/cm. The volume ratio is 6; the conductivity ratio is 5. Their relative difference is (6 - 5) / 5 x 100 = 20%, above EPA's screening threshold.

Using conductivity as a concentration proxy, estimated concentrated-liquid discharge is 12,000 / 5 = 2,400 gallons, leaving about 400 gallons beyond metered blowdown. Veolia notes that treatment chemicals can raise conductivity independently of concentration. Confirm the estimate with a dissolved-ion balance, choosing a constituent the treatment neither adds nor removes, and verify the meters. Then trace drift, leakage, overflow and other outlets before changing blowdown control.

Makeup flow also controls chemical feed

DOE's Cooling Tower Management BMP recommends automated chemical feed for cooling-tower systems larger than 100 tons, controlled from makeup-water flow or real-time chemical monitoring. That makes the makeup meter part of treatment control as well as water accounting.

After a meter replacement, reconcile the controller's volume-per-pulse setting with the meter output. A totalizer can display the correct volume while a wrongly configured pulse input commands the wrong feed quantity. Keep the pulse setting, meter units and chemical-feed basis together in the service record so an equipment change does not silently change the treatment program.

Recovered condensate changes purchased water first

DOE identifies air-handler condensate as a useful makeup source because it has low mineral content and its production tends to coincide with high cooling demand. Count it inside the tower's total supply even though it bypasses the utility-water meter.

A tower supplied with 9,000 gallons of utility water and 3,000 gallons of recovered condensate still receives 12,000 gallons of makeup; purchased water accounts for 9,000 gallons. When the blend changes during the reporting period, calculate the concentration of the chosen dissolved ion using the source volumes and analyses. A grab sample represents only the blend present at sampling.

Distinctions

Hydronic make-up water
The closed-loop make-up water entry concerns replacement in a pressure-maintained hydronic circuit. Apply the tower's evaporation and concentration accounting to its open water circuit, not to the sealed chilled-water side.
Makeup air
On an air-balance drawing, makeup describes replacement airflow. Use the building pressurization guide for that quantity; tower makeup totals are water volumes.

Frequently asked questions

Can conductivity be on target while a tower wastes makeup water?

Yes. Unmetered liquid discharge can remove dissolved solids while the fill valve replaces the lost water. Conductivity alone will not account for that discharge; compare it with matched makeup and blowdown records.

Is the condenser-water pump flow the makeup rate?

No. The pump recirculates water already in the system. Measure makeup at the incoming supply and report its total over a defined period, including every supplemental source.