ANVILFIELD Try FieldOS

Field glossary · process

Make-up water

Make-up water is water added to replace losses from a system. Its diagnostic meaning depends on the system boundary: a cooling tower deliberately loses water through evaporation and blowdown, while a closed hydronic loop should not need continuous replenishment after filling and venting. Meter the addition and identify its destination before interpreting a rising make-up total as normal consumption or a leak.

Fresh water the fill valve adds to hold loop pressure; every gallon brings oxygen and minerals, so a rising count signals a leak

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Reconcile the tower meter with the concentration ratio

The U.S. Department of Energy defines normal cooling-tower make-up as the sum of evaporation, blowdown, and drift. Leaks, overflow, and unintended discharge add losses outside that intended balance. Reading the make-up meter alone cannot identify which loss increased.

EPA's WaterSense at Work cooling-tower guidance recommends meters on make-up and blowdown lines. With negligible drift and other losses, make-up volume divided by blowdown volume estimates cycles of concentration; circulating-water conductivity divided by make-up conductivity provides a separate estimate. Compare both over the same operating period. A mismatch points to unmetered discharge, meter error, or dissolved-solids assumptions.

Calculate the water saved by higher cycles

DOE's cooling-tower guidance reports that increasing cycles of concentration from 3 to 6 reduces make-up water by 20%. The water balance explains the result: with evaporation of 100 gallons per hour and negligible drift, three cycles require 50 gallons per hour of blowdown and 150 gallons per hour of make-up. Six cycles require 20 and 120 gallons per hour respectively.

For that balance, B = E ÷ (C - 1) and M = E + B, where B is blowdown, E is evaporation, C is cycles of concentration, and M is make-up. These equations neglect drift and unintended losses. Scale-forming constituents and the treatment program determine the allowable cycles, so keep those limits beside the volume and conductivity trends.

Use different alarm logic for a closed loop

A hydronic system's automatic fill valve can maintain pressure while concealing a slow leak. Trend accumulated make-up volume against known filling, venting, draining, and repair events. Once those events are accounted for, recurring addition needs a physical explanation even when the pressure gauge remains steady.

Attach dated meter readings to each drain-and-refill event in the hydronic make-up and glycol record. Compare the added volume after a repair with an equivalent operating period before it. An isolated refill has a documented cause and endpoint; repeated additions after that event need a separate loss investigation.

Keep tower and closed-loop meters separate in a shared plant report. Combining their totals makes legitimate tower evaporation large enough to hide a smaller closed-loop leak. Separate totals also support the cooling-water accounting used in the data-center water-use guide.

Distinctions

Blowdown
Blowdown deliberately removes concentrated circulating water. Make-up replaces that discharge plus the other losses.
Circulating flow
Circulating flow repeatedly moves the same water through the system; it is not equal to fresh-water consumption.

Frequently asked questions

Can conductivity replace a make-up meter?

Conductivity indicates dissolved-solids concentration. A volume meter measures water added. Using both lets the operator distinguish concentration control from unexplained water loss.

Sources checked

Also defined as

  • Datacenter: Water added to the cooling tower to replace what is lost: evaporation plus drift plus blowdown

Where this shows up

Next step: Map tower service accounts

Back to the full field glossary