Drift
A cooling-tower drift rating of 0.0005% means five millionths of circulating flow leaves as entrained liquid, not five ten-thousandths. At 10,000 gpm, that is 72 gallons per day of continuous operation. Those droplets carry circulating-water constituents, so drift control addresses exposure as well as water loss. At that small fraction, numerical acceptance needs a documented rating or test method; surface wetting helps locate defects.
Liquid water droplets blown out of the tower, minimized by drift eliminators, a carrier of minerals and Legionella
Convert the published percentage before estimating gallons
SPX Cooling Technologies' TR-024 paper describes modern drift performance around 0.001%, with 0.0005% achievable depending on tower configuration. Divide the percentage by 100 before multiplying circulating gpm. Using 0.0005 as the fraction would overstate a 0.0005% rating by a factor of 100.
The 2024 ASHRAE Handbook, HVAC Systems and Equipment, Chapter 40 identifies tower configuration, eliminator design, air velocity and water loading as determinants of drift loss. The same eliminator material does not establish the same drift rate in every tower. Retain the selected water flow and air duty with the quoted percentage.
Use the distribution of carryover to locate the defect
SPX's TR-024 associates localized excessive drift with damaged or missing fill sheets and eliminators. Compare the wetting pattern with eliminator joints, perimeter gaps and repaired sections. On crossflow film-fill equipment, the installed sheet count and its eliminator face must match the specified arrangement; an open bypass around intact media still lets droplets escape.
SPX's diagnostic discussion calls for at least 1,000 operating hours with water and heat load when assessing the wetting of new PVC media. That seasoning check concerns new-media performance; it does not justify leaving a missing sheet, perimeter gap or concentrated stream of carryover in service. Separate the media-age question from defects in the installed flow path.
Separate a selection rating from a field measurement
SPX's paper states that drift below 0.0005% is difficult to measure accurately and repeatedly in the field. A spot photograph or deposited mineral stain cannot verify a numerical rate at that scale. Use the manufacturer's identified performance basis and a defined measurement method for a numerical acceptance requirement. Carry eliminator findings into the tower water-treatment record alongside the operating conditions.
Keep drift control in the water-management record
ASHRAE's 2024 cooling-tower chapter identifies drift as a Legionella transmission route and calls for replacing deteriorated eliminators. Close an eliminator-repair item with the installed configuration, repaired area and operating water-distribution observations. Keep the separate water-management results attached to that record so a repair sign-off is not recorded as proof of microbiological control.
Distinctions
- Plume
- ASHRAE describes visible tower fog as condensation from saturated discharge air mixing with ambient air. Its appearance does not measure the rate of circulating-water droplet loss.
Field example
At 10,000 gpm circulating flow and a 0.0005% drift rating, discharge is 10,000 x 0.000005 = 0.05 gpm. Over continuous 24-hour operation that is 72 gallons. The calculation uses circulating flow, rather than makeup flow, and assumes the tower remains at the stated rating condition throughout the day.
Frequently asked questions
Can replacing missing media alone certify a drift percentage?
Repair restores the intended flow path. A numerical performance claim still needs the selected tower configuration and its documented rating or test basis.
Sources checked
Also defined as
- Datacenter: Fine liquid droplets carried out of the tower by the airflow, limited by drift eliminators
- Datacenter: Water carried off as droplets, a water loss and the main Legionella aerosol path