ANVILFIELD Try FieldOS

Field glossary · process

Blowdown / bleed

Controlled tower bleed and total liquid loss are different quantities. A conductivity controller opens the bleed valve to limit mineral concentration, but drift, leaks and overflow remove concentrated water too. Estimate total liquid loss by dividing makeup volume by measured cycles, then subtract the metered bleed. The remainder exposes water escaping outside the controlled discharge, even when the controller holds its setpoint.

Water purged on purpose to keep dissolved solids from concentrating without limit

Used across 3 Anvilfield field guides, most in HVAC.
Updated

Use conductivity and volume as independent checks

DOE's cooling-tower management guidance calls for comparing the circulating-to-makeup conductivity ratio with the makeup-to-blowdown volume ratio. Agreement supports the intended cycles of concentration; disagreement directs attention to unmetered draw-off, leaks, controls or meter performance. Compare volumes accumulated over the same operating period, rather than unrelated instantaneous readings.

DOE recommends makeup and blowdown meters for tracking tower water use. If their volume ratio is eight while the conductivity ratio is four, the small bleed reading cannot explain all the water carrying minerals away. Reconcile both meters over the same controller-cycle window and take conductivity samples from the makeup supply serving that window.

Include liquid losses that bypass the bleed meter

Veolia's Water Handbook includes drift, leakage and intentional discharge together when calculating cooling-tower blowdown. Label that combined liquid loss L to distinguish it from the bleed-valve meter. At steady conditions, the dissolved-solids balance gives L = M / C, where M is makeup and C is cycles; evaporation is the remaining volume, M - L.

Subtract drift, leakage and overflow from L to find the controlled bleed allowance. Log both the valve command and measured discharge in the tower commissioning record. A closed command accompanied by continuing flow identifies a different fault from a correctly closing valve whose tower is losing water through an overflow.

Tie chemical replacement to the water that leaves

Veolia explains that treatment chemicals are not removed by evaporation; their replacement follows losses through liquid discharge and the chemistry's own consumption. A stuck-open bleed valve therefore wastes treated water as well as makeup. Read chemical usage alongside the bleed volume, controller command and actual discharge, rather than judging valve condition from a screen indication alone.

Distinctions

Basin draining
A maintenance drain-down is a separate operating event. Include its volume in the accounting period instead of treating it as steady conductivity-controlled bleed.

Field example

During eight steady operating hours, makeup records 38,400 gallons and the conductivity ratio is four. Calculated liquid loss is 38,400 / 4 = 9,600 gallons. The bleed meter records 7,200 gallons, leaving 2,400 gallons unaccounted for, or 5 gpm. Evaporation accounts for the other 28,800 gallons.

Frequently asked questions

Does less measured bleed always mean better water efficiency?

A leak or overflow also carries minerals out and can reduce the controlled bleed demand. Compare total makeup with the heat load and both meter and conductivity ratios.

Sources checked

Also defined as

  • Datacenter: Water deliberately discharged from the tower to keep dissolved minerals from concentrating and scaling
  • Concentrated water drained off to control cycles and scaling

Where this shows up

Next step: Locate cooling tower accounts

Back to the full field glossary