ANVILFIELD Try FieldOS

Field glossary

Cooling tower

A cooling tower rejects building or process heat to the air by evaporating a small fraction of its water, cooling the condenser water a chiller dumps heat into.

Used across 1 Anvilfield field guides, most in HVAC.

Where this shows up

PorchRocket's Asset Search is the asset source for cooling tower, locating cooling towers visible from above with the owner of record on each find.

Next step: Search for cooling towers

Back to the full field glossary