Wet-bulb

Wet-bulb and wet-bulb temperature name the same air property; a cooling-tower test must also identify which air was sampled. With 85°F leaving water, 80°F entering wet-bulb and 77°F ambient wet-bulb, approach is 5°F at the intake but 8°F against ambient. That 3°F inlet penalty belongs in the diagnosis. SPX recommends using entering wet-bulb for tower selection and thermal testing.

The lowest temperature evaporation can reach, the floor the tower works against and the driver of free-cooling hours

Used across 4 Anvilfield field guides, most in HVAC.
Updated

Ambient and entering wet-bulb require different sampling

SPX Cooling Technologies defines entering wet-bulb as the average condition of all air entering the tower, including recirculated discharge air. Its ambient definition excludes that tower's own recirculation. Substituting one for the other changes what the performance calculation measures.

SPX's thermal-test guidance describes ambient testing with at least three wet-bulb instruments located 50 to 100 feet upwind of the tower. It also calls for accounting for the temperature and quantity of interfering air streams from other sources. An entering-air test instead distributes instruments across the intakes to represent all incoming air, including the tower's own recirculated discharge.

Use the stated test basis when following the tower commissioning guide. A sensor near a building exhaust or another tower records the combined local air condition. The record should identify that exposure so a later reviewer can distinguish a changed inlet condition from changed equipment performance.

Separate an inlet-air penalty from tower approach

Using SPX's distinction between entering and ambient conditions, take simultaneous readings of 85°F leaving water, 80°F entering wet-bulb and 77°F undisturbed ambient wet-bulb. The resulting 8°F water-to-ambient difference contains two separate contributions. Assigning the whole difference to the fill or heat-transfer surfaces hides the inlet-air contribution.

This calculation follows SPX's separation of entering and ambient conditions. It does not identify which source warmed the inlet: that takes intake measurements and observation of the air paths. Keep the wind condition and nearby equipment status with the temperature record, then use the tower operation guide to trace the relevant airflow arrangement.

Temperature differenceCalculationResult
Tower approach to entering air85°F - 80°F5°F
Entering-air elevation above ambient wet-bulb80°F - 77°F3°F
Leaving water above ambient wet-bulb85°F - 77°F8°F

Count wet-bulb bins only during the operating schedule

ASHRAE's 2025 Weather Data Viewer supports joint dry-bulb and wet-bulb frequency data restricted to selected hours, including a 7 a.m. to 7 p.m. operating window. An all-hours climate distribution and a daytime-only distribution answer different questions for a plant that shuts down overnight.

Apply ASHRAE's frequency-to-hours method to the schedule used to create the bins. For a plant operating 12 hours every day of a 365-day year, the base is 4,380 hours; a 20 percent qualifying share means 876 hours. The same share over an 8,760-hour schedule means 1,752 hours. Using the full-year multiplier with daytime-only bins doubles this estimate. Equipment enable conditions still come from the economizer sequence.

ASHRAE's Weather Data Viewer FAQ states that the product does not provide an hourly time series or typical meteorological year data. A histogram counts occurrences but loses their order. It therefore supports an hours calculation without proving the duration of an uninterrupted hot spell, which requires chronological weather data.

Distinctions

Design wet-bulb
A selected climatic design input. A field measurement documents the air during the test; neither value replaces the other without identifying the selection or test conditions.

Frequently asked questions

Can an airport wet-bulb reading diagnose my cooling tower?

It supplies regional weather context. A tower diagnosis needs representative air at the specified measurement location, especially where structures or exhaust alter the intake.

Does a worse ambient-based approach prove the fill is fouled?

Separate the intake-air temperature penalty first. Higher entering wet-bulb can increase the water-to-ambient difference without an equal deterioration in the tower's entering-air approach.

Sources checked

Also defined as

  • Datacenter: The lowest temperature reachable by evaporation alone, set by the air's temperature and humidity
  • The lowest temperature evaporation can drive water toward, the floor a tower can approach but never beat