Blowdown
Blowdown removes concentrated water or settled solids from water-using equipment, but its control basis depends on the system. Tower bleed controls dissolved solids left by evaporation; steam-boiler surface blowdown controls dissolved solids in boiler water, while bottom blowdown removes sludge. Identify the discharge stream, its measurement point and the denominator used for its rate before comparing settings or water-use records.
Water bled from the loop to hold dissolved solids in range
Compare the two independent checks on tower bleed
DOE's Cooling Tower Management guidance recommends comparing the blowdown-to-makeup conductivity ratio with the makeup-to-blowdown flow ratio. Both estimate cycles of concentration when the water and dissolved-solids balances support that comparison. A disagreement points toward leakage or another draw-off rather than proving the conductivity controller needs a different setpoint.
A tower with 300 microsiemens/cm makeup and 900 microsiemens/cm circulating water is at three conductivity cycles. Makeup of 6,000 gal/day and metered blowdown of 1,200 gal/day instead imply five flow-ratio cycles. At steady operation, with conductivity tracking dissolved solids, the three-cycle balance calls for 2,000 gal/day of total liquid discharge. The 800 gal/day difference belongs in the search for drift, leakage or another unmetered outlet.
A boiler blowdown percentage needs its denominator
DOE Steam Tip Sheet 9, Minimize Boiler Blowdown, reports typical blowdown rates of 4% to 8% of boiler feedwater flow, reaching 10% with high-solids makeup. These are feedwater percentages. Applying the same percentage directly to steam output understates the discharge because feedwater supplies both steam and blowdown.
For 10,000 lb/hr of steam and blowdown equal to 8% of feedwater, feedwater is 10,000 / 0.92 = 10,870 lb/hr and blowdown is about 870 lb/hr. Multiplying steam output by 8% gives 800 lb/hr and misses about 70 lb/hr. State feedwater, steam or makeup explicitly beside every reported percentage.
Do not use one sample to represent every discharge
DOE Steam Tip Sheet 9 assigns settled-solids removal to bottom blowdown and dissolved-solids control to surface blowdown; that distinction determines what a discharge sample represents. Label a bottom-discharge sample as sludge removal and a surface sample as dissolved-solids control. If both streams enter one blowdown meter, its interval total includes both operations and cannot be assigned entirely to the surface controller.
EPA WaterSense's boiler guidance identifies condensate recovery as the most effective water-saving measure for boiler and steam systems because returned condensate reduces makeup requirements. That changes the incoming solids load and therefore the blowdown requirement. A calendar setting carried forward after condensate recovery improves can waste treated hot water. Record the incoming water, discharge stream and rate denominator with the boiler treatment log; put tower readings in their own conductivity and flow record.
Distinctions
- Evaporation
- Evaporation appears in the water balance but carries essentially none of the dissolved mineral load. For the tower example, the 6,000 gal/day makeup minus 2,000 gal/day liquid discharge leaves 4,000 gal/day of evaporation.
- Closed-loop dirt discharge
- A separator discharge removes captured debris. It is not automatically a continuous dissolved-solids control program.
Frequently asked questions
Does higher blowdown always mean better water treatment?
Excess bleed wastes water, treatment chemicals and, on a boiler, heat. The treatment target and incoming water quality determine the required discharge.
Can conductivity alone prove the blowdown volume?
No. Conductivity indicates concentration. Flow meters establish water quantities; comparing the two balances exposes unmetered losses.
Sources checked
Also defined as
- HVAC: Draining boiler water to remove sludge (bottom) and dissolved solids (surface) so they do not concentrate