Field glossary · property
Latent heat
Use specific latent heat, hfg, for the phase-change portion of a steam duty and multiply by vapor mass flow to obtain a heat rate. TLV lists approximately 2,201 kJ/kg at 100 kPa gauge, so condensing 100 kg/h of dry saturated steam releases about 61.1 kW through condensation. Using total steam enthalpy instead includes energy retained in the hot liquid. Wet steam requires the vapor fraction as well.
The heat absorbed or released in a phase change, about 970 Btu per pound when steam condenses at atmospheric pressure
Read hfg instead of total steam enthalpy
TLV's steam-table guide identifies hf as saturated-water enthalpy, hg as saturated-steam enthalpy and hfg as the latent heat of evaporation. The relationship is hfg = hg - hf. Selecting hg instead of hfg includes the energy retained by the saturated liquid after condensation.
At 100 kPa gauge, TLV's table lists a saturation temperature of 120.42°C and latent heat of approximately 2,201 kJ/kg. Its saturated-liquid enthalpy is 505.6 kJ/kg and total saturated-steam enthalpy is about 2,707 kJ/kg. The rounded columns describe different portions of the heat balance.
On a steam-heating duty calculation, write the selected hfg beside steam pressure and quality. Keep feedwater heating and condensate subcooling on separate lines so they are not silently included in the condensation load.
Pressure and steam quality change the useful quantity
Spirax Sarco gives approximately 2,257 kJ/kg for the latent heat of water at atmospheric pressure. That is higher than TLV's 100-kPa-gauge value even though the higher-pressure steam is hotter. Increasing saturation pressure increases liquid enthalpy while reducing the energy gap between liquid and vapor.
TLV places water's critical pressure at approximately 22.06 MPa, where the latent heat of vaporization reaches zero. The familiar low-pressure steam value must not be carried unchanged into a high-pressure heat balance or a different working fluid.
Wet steam contains liquid as well as vapor. For a mixture at saturation, only its vapor mass fraction has the full latent heat left to release through condensation. A 0.95 dryness fraction means 95% of each kilogram is vapor; use that vapor fraction when calculating the latent portion, and account for subsequent liquid cooling separately.
Turn a mass rate into a heat rate
Condensing 100 kg/h of dry saturated steam at the cited 100 kPa gauge condition releases 100 × 2,201 = 220,100 kJ/h of latent heat, or about 61.1 kW. Using the total hg value instead would report about 75.2 kW and silently include energy still present in the hot condensate.
At 95% dryness, the same total mixture flow has 95 kg/h of vapor and releases about 58.1 kW through condensation. Cooling the resulting liquid below its saturation temperature adds sensible heat transfer; specify the actual condensate outlet condition to calculate that additional contribution.
Record pressure as gauge or absolute before selecting the table row. TLV's gauge table places atmospheric pressure at zero, whereas an absolute-pressure table places it near 101.3 kPa. Confusing those bases changes both the selected saturation temperature and latent-heat value.
Distinctions
- Latent load
- A heat-transfer rate associated with a phase-change duty, often moisture removal in HVAC. Latent heat per kilogram becomes a load only after a mass rate is supplied.
Frequently asked questions
Is the latent heat of melting ice the same as vaporizing water?
No. Fusion and vaporization are different phase changes with different energy requirements. Specify which process the value describes.
Does latent heat have units of kW?
Specific latent heat has units such as kJ/kg or Btu/lb. Multiply by a compatible mass-flow rate to obtain a heat rate such as kW or Btu/h.
Sources checked
Also defined as
- Datacenter: The heat a fluid absorbs to change state from liquid to vapor with no change in temperature; far larger than sensible heat per unit of fluid
- Datacenter: The energy absorbed when water changes from liquid to vapor, roughly 1000 BTU per pound