ANVILFIELD Try FieldOS

Field glossary · material

Condensate

A condensate recovery calculation needs the liquid's source, temperature, and mass flow at the receiving boundary. DOE's steam example puts the recoverable heat of 180°F condensate above 55°F makeup water at 125 Btu per pound. Cooling-coil moisture and combustion-exhaust condensate require different collection and treatment decisions; the shared name does not establish compatibility with a steam return. Include any flash-vapor outlet when reconciling recovered mass.

The water that forms when steam gives up its heat and condenses, returned to the boiler to be reused

Used across 3 Anvilfield field guides, most in HVAC.
Updated

How much heat remains in steam condensate?

DOE Steam Tip Sheet 8 gives typical returned-condensate temperatures of 130°F to 225°F, compared with makeup water at 50°F to 60°F. DOE's 100 psig steam example finds that condensate at 180°F retains about 11% of the steam energy available above 55°F makeup water. That percentage uses the makeup temperature as its reference, rather than treating the condensate's absolute enthalpy as a savings figure.

Using DOE's enthalpies of 148 Btu/lb for 180°F condensate and 23 Btu/lb for 55°F makeup, each recovered pound brings back 125 Btu above the makeup baseline. Returning 2,000 lb/h at those conditions preserves 250,000 Btu/h in the incoming water. This is recovered water-side heat; fuel-input savings additionally depend on boiler efficiency.

Measure return temperature where the condensate enters the receiving system. A temperature at the remote steam trap credits heat that an uninsulated return can lose before reaching the plant. The steam fundamentals guide follows the piping circuit; the recovery calculation needs temperature and mass flow at the same accounting boundary.

Why a pressure drop produces flash steam

Spirax Sarco calculates that saturated condensate falling from 7 bar gauge to atmospheric pressure flashes 13.4% of its incoming mass into steam. The water arrives with more energy than liquid can retain at the lower pressure, and part of it evaporates to carry that excess energy.

For the manufacturer's 250 kg/h incoming stream, 33.5 kg/h becomes flash steam and approximately 216.5 kg/h remains liquid. A liquid return meter downstream of the pressure reduction therefore reads less than the incoming condensate mass even with no pipe leak. Account for the vapor outlet when reconciling the return.

Spirax Sarco's calculation reduces the flash fraction to 10.4% when that same 7 bar gauge condensate is subcooled by 15°C before discharge to atmosphere. Trap-inlet temperature and receiving pressure belong beside the flow reading. Save those conditions with the acoustic and temperature observations from the trap commissioning guide so the return balance and trap diagnosis use the same operating state.

Separate recovery water from drain water

Cooling-coil condensate starts as airborne moisture but contacts fins, pans, biofilm, and drain piping. Its low mineral content makes it useful for some nonpotable applications, not an automatic substitute for treated boiler feedwater. DOE's cooling-tower guidance identifies air-handler condensate as a potential makeup source because production often coincides with the tower's highest cooling load.

Keep combustion condensate on its appliance's treatment and disposal path, identified separately from cooling-coil drainage on the collection drawing. The steam-return calculation above credits a measured stream at a known enthalpy; it does not qualify either drain stream as boiler feedwater. Document the receiving connection alongside the drainage arrangement in the condensate drain guide.

Distinctions

Boiler blowdown
In a plant balance, put recovered steam condensate on the return inlet and boiler blowdown on the concentrated-water outlet. The 125 Btu/lb return credit above belongs to the measured 180°F return stream; it cannot be assigned to blowdown without its own temperature and recovery calculation.

Frequently asked questions

Is every gallon missing from the condensate return a leak?

No. Flash vapor, direct steam use, intentional drains, and changing receiver inventory also affect the balance. Compare consistent boundaries and include both liquid and vapor outlets.

Can AC condensate supply a cooling tower?

DOE identifies it as a makeup-water source. Size collection around measured seasonal production and incorporate its chemistry and collection condition into the tower treatment program.

Sources checked

Also defined as

  • The liquid water a cooling coil pulls out of the air as it dehumidifies

Where this shows up

Next step: Find rooftop service accounts

Back to the full field glossary