psig / ounces

An ounce-scale steam-pressure setting is ounce-force per square inch: 12 oz/in² equals 0.75 psig when referenced to atmosphere. It is also distinct from a controller's switching differential. On a subtractive control, a 12-ounce cutout and 4-ounce differential produce an 8-ounce cut-in. Identify the units, cutout and differential action together; the scale range and surge rating describe different limits of the instrument.

Pressure above atmospheric; heating steam often runs in ounces per square inch, 16 ounces to a psi

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Translate ounces without losing the gauge reference

Using NIST's pound-force and ounce-force conversion factors, 1 ozf/in² equals 0.0625 psi, so 12 oz/in² equals 0.75 psi, approximately 5.17 kPa. Retain the gauge reference when reporting it as a steam operating pressure. Dividing the number by sixteen converts the scale; it does not convert gauge pressure to absolute pressure.

A reading of 8 oz/in² is 0.5 psig, and 4 oz/in² is 0.25 psig. Label the pressure and differential separately in the steam commissioning record. An 8-ounce operating pressure and an 8-ounce switching differential describe different control facts even though they use the same unit.

Gauge reading, ozf/in²Equivalent psig
40.25
80.50
120.75
161.00

Read the controller range and differential action

Honeywell lists L408J Vaporstat controllers with 0 to 16 oz/in² or 0 to 4 psi ranges. A replacement control from the same family can therefore carry a different scale. Identify the actual model and range on the cover and device record before comparing its settings with an old commissioning sheet.

Honeywell describes the L408J differential as subtractive. For a control record with a 12 oz/in² cutout and 4 oz/in² subtractive differential, the calculated cut-in is 8 oz/in². The differential is subtracted from the main cutout value. A controller with additive differential uses a different relationship, so the word “differential” alone does not specify the switching logic.

A broad-range gauge can conceal an ounce-scale cycle

An instrument specified at ±1% of full scale on a 0 to 30 psi range has a ±0.30 psi accuracy specification, equivalent to ±4.8 oz/in². That band is larger than the 4-ounce differential in the control record above. Display increments and a zero-looking pointer cannot establish the true switching points at that scale.

Honeywell rates the L408J family for a maximum surge pressure of 15 psi, separately from its operating ranges. A transient-survival rating is not a normal control setpoint or a substitute for the boiler's pressure limits. For steam-system troubleshooting, retain the actual control model, gauge range and observed switching points rather than copying the surge number onto the operating schedule.

Distinctions

psia
Absolute pressure uses a vacuum reference. Saturated-steam property calculations require the appropriate absolute pressure, while the operating gauge normally reads above atmosphere.
Ounces of condensate
A mass or volume quantity concerns how much material is present. Ounce-force per area concerns pressure.

Frequently asked questions

How many psi are 12 ounces of steam pressure?

Twelve ounce-force per square inch is 0.75 psi. On a gauge-referenced heating control, report it as 0.75 psig.

Does a 15 psi surge rating mean a Vaporstat controls to 15 psi?

No. Honeywell lists separate 0 to 16-ounce and 0 to 4-psi operating ranges; surge tolerance is a separate specification.

Sources checked

Also defined as

  • Gauge pressure above atmospheric; heating steam often runs only ounces, well under 15 psig