Field glossary · method
Draw-through / blow-through
The practical draw-through versus blow-through check follows heat and drain pressure through the unit. With a draw-through fan downstream of the coil, 50°F coil-leaving air becomes 52°F supply air if measured fan heat adds 2°F; an upstream blow-through fan puts that heat into the coil's load instead. Record both sensor locations and the manufacturer's complete trap dimensions before comparing a selection or accepting the drain installation.
Fan downstream of the coil (negative pan pressure) versus upstream of it (positive), which sets the trap
Which temperature is leaving the coil?
The 2024 ASHRAE Handbook, HVAC Systems and Equipment, says draw-through fan heat must be included when calculating supply-air temperature because it enters downstream of the cooling coil. A coil leaving at 50°F followed by a measured 2°F fan temperature rise delivers 52°F air from the unit. A controller maintaining 50°F downstream would need colder coil-leaving air under that operating condition.
ASHRAE also identifies a latent-load consequence: lowering an already saturated coil-leaving condition to compensate for downstream fan heat removes additional moisture. In a blow-through arrangement, ASHRAE describes the upstream fan heat as a sensible load that the cooling coil removes. The same supply-air target can therefore require different coil selections for the two arrangements.
Put sensor locations on the test sheet beside each temperature. A coil probe, a probe after the fan, and a duct sensor downstream of other heat gains represent different conditions. The AHU components guide identifies the sections; tracing the actual air path establishes which heat sources each sensor includes.
Use the trap dimensions for the selected unit
Johnson Controls' YORK Series 40 manual 5276178-JIM-E-0119 sets the draw-through trap's H dimension at the fan's design total static pressure, expressed in inches water gauge, plus at least 0.5 inch. At 3.0 inches water gauge design total static pressure, H is at least 3.5 inches. This equipment-specific sizing basis includes more than a convenient external-static reading.
YORK's Figure 25 also sets a separate Y dimension of at least 2 inches between the drain connection and the trap outlet level. In the 3.0-inch-pressure example, H plus Y requires at least 5.5 inches of vertical difference from the drain connection to the lower dimension line, with fitting outside dimensions and installation clearance added. Reserving only the 3.5-inch H dimension would leave the layout short.
A blow-through coil does not justify copying the draw-through dimensions. Its positive pan pressure pushes water and air toward the drain outlet; its specified trap must retain a seal under that condition. The condensate drain guide covers drainage faults and maintenance; the unit drawing supplies the required geometry.
Test drainage with the fan running
YORK's Series 40 instructions require the trap to be charged with water before startup. An empty trap cannot demonstrate the intended pressure seal. Record the primed condition, start the fan, and observe whether condensate leaves the pan continuously at the operating fan setting.
Compare the pan level at fan startup and after condensate production stabilizes, using YORK's Figure 24 operating stages as the reference. If the pan level rises while the fan runs, compare installed H and Y, trap charge, fan setting, and downstream drain condition before changing the piping. Keep the fan state with each observation so the result can be reproduced.
Distinctions
- Coil-leaving versus supply-air temperature
- The 50°F coil probe and 52°F downstream probe in the example can both be correct. Their measured 2°F difference is the fan-heat contribution between those locations, so comparing either reading with an unlabeled leaving-air target would hide the measurement boundary.
Frequently asked questions
Does fan location change airflow across the coil?
ASHRAE describes draw-through flow as generally more uniform. A blow-through fan outlet can concentrate flow on part of the coil, so the unit arrangement may require a diffuser or diverter; plenum fans can improve distribution.
Can the curb be too short for the trap?
Yes. Compare the complete specified trap geometry and drain slope with the installed clearance before setting the unit. A shortened water seal does not preserve the manufacturer's pressure allowance.
Sources checked
Also defined as
- Fan after the coil (draw-through, common) or before it (blow-through)