Latent load

Size an HVAC latent load from the required moisture-removal rate and the hours available to remove it. DOE's portable-air-conditioner test method uses 1,061 Btu per pound of water vapor for its latent calculation; removing 6 lb/h therefore represents about 6,366 Btu/h of latent duty. A dehumidifier's pints-per-day rating must also match entering-air conditions and runtime. Efficiency in liters per kWh does not establish removal capacity.

The moisture load, the energy needed to remove water vapor from the air, separate from temperature

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Convert moisture removal to Btu/h

DOE's 2026 codified portable-air-conditioner test method, 10 CFR 430 Appendix CC, uses 1,061 Btu/lb for the latent heat of water vapor in its infiltration calculation. Using that HVAC calculation basis, latent Btu/h = water removed in lb/h × 1,061. Removal of 6 lb/h carries 6,366 Btu/h of latent duty, about 0.53 refrigeration ton at DOE's 12,000 Btu/h per ton.

For an airstream calculation, multiply dry-air mass flow by the drop in humidity ratio to obtain water removal. At 4,500 lb of dry air per hour and a 0.002-lb-water/lb-dry-air decrease, the coil removes 9 lb/h; using the same latent basis gives 9,549 Btu/h. Keep this coil moisture balance separate from moisture entering the room and from the equipment's daily rating.

Translate a daily moisture budget into operating hours

ENERGY STAR defines dehumidifier capacity as water removed over 24 hours at the specified test conditions, reported in pints per day. A 60-pint-per-day rating therefore represents 2.5 pints per hour at those conditions. It does not promise 60 pints of removal during a short occupied period.

A space needing 48 pints removed per day requires 19.2 operating hours from that 2.5-pint-per-hour capacity. If only eight hours are available, the required average removal during operation is 6 pints per hour, equivalent to 144 pints per day on the same continuous-operation basis.

Check the selected equipment's performance at the actual entering-air condition before using that arithmetic for selection. Put the available operating hours alongside each moisture duty assigned to a DOAS or room dehumidifier. A daily water-removal budget needs both a rate and sufficient runtime.

Compare ratings made at the same air condition

ENERGY STAR explains that the DOE portable-dehumidifier test temperature changed from 80°F to 65°F with the procedure used for the 2019 requirements. The cooler test generally yields a smaller rated water-removal capacity for otherwise comparable equipment. A lower number on a newer label does not by itself establish reduced performance.

DOE's 2026 codified Appendix X1 specifies 65°F dry-bulb and 60% RH for portable dehumidifiers, versus 73°F dry-bulb and 60% RH for whole-home units. Compare capacities on the matching category's rating basis, then use performance at the actual entering-air condition. A warm-air catalog rating overstates the removal available in a cooler room if capacity falls with entering temperature.

ENERGY STAR defines integrated energy factor in liters of water removed per kWh and notes that it includes energy used while the unit is cycled off. This is an efficiency measure, not the hourly moisture-removal capacity. A high-efficiency unit still needs enough capacity and runtime for the moisture budget.

Look beyond the peak cooling hour

DOE's October 2014 warm-humid dehumidification guideline describes latent capacity at summer cooling design conditions as generally 20% to 25% of total cooling capacity. The same guidance identifies shoulder seasons, rainy periods and some summer nights as times when supplemental dehumidification is needed because sensible-cooling demand is lower.

An air conditioner selected for the hottest afternoon may satisfy the thermostat quickly on a mild humid evening. The shorter run does not remove the day's remaining moisture simply because the equipment has sufficient peak total tonnage. Compare moisture removal across the actual operating hours, including times when outdoor air and occupancy continue adding water vapor.

Condensate collected during a known interval measures water actually removed during that interval, provided all drain paths are included. It does not automatically equal the building's full latent demand: indoor humidity can still be rising, moisture can be stored in materials, and other equipment can be removing part of the load.

Distinctions

Relative humidity
A condition of the air at its current temperature. It is not a water-removal rate or a direct substitute for latent-load capacity.

Frequently asked questions

Can I size a dehumidifier from room RH alone?

No. Identify the moisture sources, outdoor-air contribution, target condition, entering-air conditions and available operating hours. RH describes the current state, not how quickly moisture enters.

Is a full condensate bucket proof the humidity problem is solved?

It proves some moisture was removed. Confirm the removal rate and indoor moisture trend over the relevant operating period.

Sources checked

Also defined as

  • The moisture-removal part of the cooling load that determines how much condensate forms