DOAS

A dedicated outdoor air system, or DOAS, should be selected by ventilation airflow and moisture removal as well as cooling capacity. For DX equipment, AHRI 920-2026 reports moisture removal per unit of input energy; its MRE70 metric also counts supplementary energy needed to reach 70°F supply air. Comparing that neutral-air duty with a cooling-only rating can make an otherwise similar unit appear more efficient than it is for the specified job.

Dedicated outdoor air system, equipment that treats ventilation outdoor air separately from recirculating space conditioning

Used across 5 Anvilfield field guides, most in HVAC.
Updated

Which DOAS rating applies in 2026?

AHRI Standard 920-2026, approved January 20, 2026, combines the former I-P and SI documents into one rating standard for DX dedicated outdoor-air units. It incorporates the previous addendum. Identify the edition and efficiency metric on each submittal before comparing units.

AHRI 920-2026 defines the covered DX-DOAS product by its ability to dehumidify 100% outdoor air to a 55°F dew point under standard rating condition A. That rating capability does not make 55°F the required leaving dew point for every building. Coil selection still follows the assigned outdoor and room moisture loads.

Compare moisture efficiency with and without neutral-air duty

AHRI 920-2026 defines moisture removal efficiency, MRE, as moisture-removal rate divided by total power input, expressed in pounds or kilograms of moisture per kilowatt-hour. Greenheck's DOAS rating explanation distinguishes that moisture-based duty from the cooling-capacity-based EER used for conventional unitary equipment. The metrics have different numerators and cannot be compared as matching efficiency scores.

AHRI 920-2026 adds the energy input for supplementary heat needed to reach 70°F when calculating MRE70. Its integrated seasonal counterpart, ISMRE2 70, combines the specified rating conditions. Request that exact metric when the schedule requires neutral supply air, so a rating that excludes the additional heating duty is not substituted in the comparison.

Keep the selection and field measurements on the same basis

Request rated airflow, moisture-removal capacity, total input power and the supply-temperature basis together. During DOAS commissioning, record entering and leaving humidity ratio with airflow and reheat mode. Put the actual entering condition beside the submittal condition so a wet-weather field result is not compared with a different rating point as though they were the same test.

Distinctions

Energy recovery ventilator
An ERV transfers heat or moisture between airstreams. It can be part of a DOAS, but recovery effectiveness alone does not establish active dehumidification capacity.

Field example

At one test condition, a DX-DOAS removes 60 lb of water per hour using 10 kW total power, so point MRE is 6 lb/kWh. If reaching 70°F requires another 2 kW of electric input for supplementary heat, MRE70 becomes 60 / 12 = 5 lb/kWh. The added 20% input reduces moisture-removal efficiency by 16.7%; a single point still does not establish ISMRE2 70.

Frequently asked questions

Does reheating the supply air remove more water?

Sensible reheat raises dry-bulb temperature without changing humidity ratio. The drying section must remove the required moisture before reheat sets the delivery temperature.

Sources checked

Also defined as

  • Dedicated outdoor air system, which conditions ventilation air separately from the zone heating and cooling
  • Dedicated outdoor air system, which conditions all the ventilation air separately from the zone equipment

Where this shows up