Stack effect

Temperature differences create stack effect by making indoor and outdoor air columns different densities. The resulting pressure depends on the vertical distance from the neutral pressure plane, not just the building's height. In a 20°C interior with -10°C outdoors, a point 15 meters above that plane develops about 20 Pa of outward stack pressure at standard atmospheric pressure.

Warm air rising and leaking out the top of a building, pulling cold air in at the bottom

Used across 2 Anvilfield field guides, most in Roofing.
Updated

Calculate stack pressure at the floor being tested

NIST's Design Manual for Smoke Control Systems expresses shaft-to-outdoor stack pressure at standard atmospheric pressure as approximately 3,460 x h x (1/To - 1/Ti) pascals, with h in meters above the neutral plane and temperatures in kelvins. Use signed height: a point below the plane has negative h. Convert Celsius to kelvins before taking the reciprocals.

Using NIST's relationship, Ti = 293.15 K and To = 263.15 K give the signed pressures below at standard atmospheric pressure. The 20.2 Pa result is about 0.081 inch of water. These are stack contributions at specified distances from the neutral plane, rather than total pressures measured with wind and fans operating.

Position relative to neutral planeIndoor minus outdoor stack pressure
15 m below-20.2 Pa
5 m below-6.7 Pa
At the plane0 Pa
5 m above+6.7 Pa
15 m above+20.2 Pa

Locate the pressure reversal instead of assuming mid-height

Building Science Corporation's BSD-014 explains that a leakier top moves the neutral pressure plane upward. Mid-height is the result of a simplified symmetrical opening arrangement, not a dependable location in an occupied building. Shafts, open doors, exhaust systems, and unequal leakage areas change the pressure distribution.

Read a differential manometer at several elevations using sheltered outdoor references. Zero the instrument, identify its ports, and keep the indoor-minus-outdoor sign convention consistent. Record temperature, wind, open doors, and fan status with each reading. A negative-to-positive crossing locates the reversal under those test conditions. Repeat the survey with a controlled change in fan operation; that comparison exposes the fan contribution and any resulting shift of the reversal height.

Separate stack pressure from the air that leaks

BSD-014 gives a 1.34 Pa pressure difference for a one-meter air column at 20°C surrounded by -10°C air. That example develops pressure with no throughflow path. The practical distinction is that temperature and height create the pressure potential, while connected openings determine how much air moves.

Seal and compartmentalize the airflow routes identified in the envelope guide, then repeat the pressure survey. Reduced airflow can coexist with a substantial remaining pressure difference. Judge the repair from both the leakage response and the building pressurization readings.

During hot weather, a cooled building can show the reverse sign pattern: inward drive high and outward drive low. A refrigerated enclosure can maintain that pattern beyond the normal cooling season. Record the actual temperatures rather than identifying stack direction from the calendar.

Distinctions

Chimney draft
A flue uses a hotter, confined gas column. Its draft also depends on vent resistance, gas temperature, and combustion-system operation.
Fan pressure
A supply or exhaust imbalance adds to stack pressure at the measurement point. It can shift the height where the combined indoor-to-outdoor reading crosses zero.

Frequently asked questions

Does air sealing eliminate stack effect?

Air sealing reduces the connected leakage paths. The indoor-outdoor density difference still establishes a pressure potential, so verify the airflow reduction as well as the pressure.

Why do readings change when a stair door opens?

Opening the door changes the connection between the shaft, floor, and outdoors. The resulting airflow redistribution changes the measured pressure without requiring a change in outdoor temperature.

Sources checked

Also defined as