Field glossary · measurement
in. w.c. / in. wg
In. w.c. and in. wg label the same pressure unit: inches of water column. NIST's conventional conversion is 249.0889 Pa per inch, making a 5 Pa room-pressure difference about 0.0201 in. w.c. At that scale, instrument resolution matters. Identify both pressure-reference locations, the sign, and the meter specification before comparing a building-pressure reading with its control target.
Inches of water column, the unit for building and duct pressure; about 249 Pa per inch
Can the meter resolve the pressure you need?
NIST assigns 249.0889 Pa to one conventional inch of water. A 5 Pa building-pressure difference is therefore about 0.0201 in. w.c. Reporting that value on a coarse display can hide changes large enough to matter to the control sequence.
Fieldpiece specifies 0.01 in. w.c. resolution for its SDMN5 differential manometer. Using NIST's conversion, each 0.01 in. w.c. display increment represents approximately 2.49 Pa. That increment is nearly half of a 5 Pa target, so a meter suited to duct or gas-pressure work is not automatically suited to fine building-pressure adjustment.
Fieldpiece's SDMN5 sheet lists accuracy as ±1.5% of full scale, separately from its 0.01 in. w.c. resolution. Resolution describes display increments; accuracy describes allowed measurement error. Select an instrument whose range and error specification can distinguish the required room-pressure band, then verify zero under its operating instructions.
Make the reference pressure reproducible
For a room-to-corridor measurement, identify the room as the positive port and corridor as the reference, or document the reverse. A negative result then has a clear meaning. Tubing moved to outdoors creates a different comparison even if the display still says inches of water.
Zero the meter with both ports exposed to the same pressure under its operating instructions. Keep the reference location away from a direct air jet or other local disturbance. Record doors, exhaust operation, supply-fan mode, and weather conditions. Apply those same operating states when repeating the building pressurization measurements, so a changed fan schedule is not mistaken for instrument drift.
Preserve the sign when converting to pascals
A recorded difference of -0.030 in. w.c. converts to approximately -7.47 Pa. Conversion changes the scale, not the direction of the pressure difference. Removing the minus sign turns a depressurized space into an apparently pressurized one.
Store the original reading and instrument unit alongside the converted value. If the instrument displays hundredths of an inch, a spreadsheet displaying five decimal places has added formatting rather than information. Use the alternate water-gauge entry when reconciling conversion conventions and control-system scaling.
Distinctions
- Gauge pressure
- Gauge pressure describes a pressure relative to a reference, usually atmosphere. The letters wg identify the water-gauge unit and do not by themselves establish that reference.
Frequently asked questions
Is in. w.c. a different unit from in. wg?
No. They are alternative labels for the same water-column pressure unit. Differences between recorded values usually require checking the reference locations, sign, conversion convention, and instrument specification.